Instructions for upgrade to material loaded assembly on Ecoline load rollers
Auteur Gareth Green | Dernière modification 18/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions for upgrade to material loaded assembly on Ecoline load rollers
R0010309_Ecoline_Ultrasonic_Material_Loaded_Upgrade_Screenshot_2024-04-18_115817.png
Upgrade of load sensor For infeed table on Ecoline machines
Component list
A0001046 P Clip 6mm Steel / Rubber Liner x 2
D0010973 Material Loaded Sensor Plate x 1
E0001104 PreMade Cable: M8 Socket 4 Way Cable 5m x 1
E0001120 Sensor: Ultrasonic M8 20-150mm x 1
M0001053 Copper Tube 6mm x 4.4mm 10m Coil x 0.3
P0000046 Fitting: 'Y' Adaptor 6mm x 1
P0000069 Tube to tube fitting 6mm x 1
P0000160 Fitting: Flow Controller In Line 6mm x 1
Remove old material load assembly from machine. Held on by 2 off M6 socket caps indicated
2 Disconnect switch/sensor. Depending on variant fitted
either
Unscrew M8 plug connection to disconnect for sensor style
Or
Disconnect 2 off fork connections onto rear on switch
3 Disconnect blower
Disconnect switch/sensor.
Depending on variant fitted
either
Unscrew M8 plug connection to disconnect for sensor style
Or
Disconnect 2 off fork connections onto rear on switch
Disconnect blower feed to assembly
6mm pipe will be connected to remove assembly via push fit connections.
Remove pipe from connections
(may not be present on some machine variants )
Assembly can now be removed fully and disregarded
Trace back cable fitted to old sensor and disconnect at connection box.
Fit new ultrasonic sensor E0001120 as shown using mounting block D0010973
Ensure cable E0001104 is fitted to sensor before mounting, and cable is fed through access point before finalising position of sensor
Route new cable to connection point previously used to disconnect old sensor cable.
Use attached drawing to connect new sensor to terminal rail in connection box
1 End of copper blower should be flattened to allow a vertical blow pattern across the front of newly fitted ultrasonic sensor
2 Use A0001046 P clips to secure blower pipe in place
3 Use P0000069 tube connection on end of copper pipe
Ensure when fitting copper pipe that no contact is made onto rotating rollers
Use original switch assembly blower line to feed new copper blower
Add P0000160 inline flow regulator to allow correct adjustment of air flow to blower
Note, if no blower line is present for the old assembly, a blue pipe line can be used to provide a permanent feed to the blower.
Completed set up by following guide