Installation details of waste guidance
Auteur Gareth Green | Dernière modification 5/09/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Installation details of waste guidance
R0015343_Waste_Guidance_Installation_Screenshot_2023-10-31_135102.png
Tools Required
Standard hex key set
Standard spanner set
Standard HSS drill set
Standard tap set
Parts Required
D0001967 Conveyor End Plate x 1
D0001970 Swarf Funnel Support x 2
D0005616 Conveyor Swarf Funnel x 1
D0010843 Conveyor Deflector Plate x 1
M0000031 Panel Edging Strip; 9 x 6mm (consumable stock )
R0015344 Bench Assemble Conveyor Parts
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Drive motor must be removed to allow access to fit side sheets
1 locking grubscrew must be slackened to allow drive motor to be removed.
Ensure drive motor is refitted after installation of waste guidance sheets
fit 2 off radius side sheets as shown
Secure using m5 slim D nuts , M5 x 10 socket caps and M5 A form washers
Position as shown 5mm from edge frame
Fit 4 off side sheet as shown
Secure using m5 slim D nuts , M5 x 10 socket caps and M5 A form washers
At position shown, Use 2 off M5 x 10button heads for clearance when motor fitted
Drill and fit deflector as shown
Ensure deflector is mounted at a height that clearance is present between conveyor belt and deflector
Provide details to enable ecr to be raised to add mounting holes
Position conveyor end plate as shown
Ensure end plate does not touch belt. Needs to be 3mm higher than belt face
Mark positions for mounting holes and remove end plate
Drill M6 clearance holes at marked points
Photos and details of this please Drill off cable tie bases for motor cable
Provide all details to enable ECR generation
Pictures Required
Secure with 4 off M5 x 10 socket caps and M5 A form washers
Add 2 off m6 rivnuts to swarf funnel pre drilled holes
Ecr raised to add rivnut to drawing 18/12/23
When positioning swarf funnel, it is vital that it does not contact the conveyor belt . Please ensure it is set so there is no contact between the two
Fit swarf funnel to conveyor brackets
Secure with M6 cap heads and washers
Picture required for correct setting position of funnel
Details and pictures Required
Drill and pin funnel in position with 2 off 3 mm spiral pins
Check all fasteners are finalised and marked
Ensure all settings have been finalised
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #