Fitting of control pipes and connections
Auteur Gareth Green | Dernière modification 11/12/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Fitting of control pipes and connections
Install_Spindle_control_pipework_and_fittings_Screenshot_99.png
Tools Required
Pipe cutters
Standard screwdriver set
Standard hex key set
Standard spanner set
Parts Required
D0010807 upstand collar x 32
P0001023 6mm compact y x 4
P0000456 M5-4mm straight fitting x 24
P0001091 Bulkhead 6mm straight x 24
P0001093 6mm - 4mm stem elbow x 8Use Loctite 243 on all fasteners
Pen mark all fasteners to show finalised
4 off
1 Mount pre assembled valve into spindle connection boxes to the left of the single slide spindle assembly (as viewed from rear)
2 Use 3 off M3 x 12 pan heads to secure valve to connection box as shown
3 Before tightening, add 4 off D0010807 upstand collars to define position of valve mounting
4 Finalise fixing
4 off
1 Mount double stack of valves into spindle boxes to the left of the double plunge spindle assemblies. (as viewed from rear)
2 Use 3 off M3 x 25 pan heads to secure valve to connection box as shown
3 Before tightening, add 4 off D0010807 upstand collars to define position of valve mounting
4 Finalise fixing
1 Double valve connections
Use compact 6mm tee P0001023 and connect two valves together as picture
Lay feed pipe over top and mark length, cut and connect
2 Single valve connections
Lay feed pipe over valve fitting, mark and cut then connect
1 Fit 4 off P0000456 m5 -4mm straight fittings to double plunge connection boxes ( 2 valve boxes)
2 Fit 2 off Poooo456 m5-4mm straight fittings to single plunge connection boxes (1 valve boxes) and 2 off M5 x5 button heads as blanks
1 Use 4mm black air pipe to connect lower valve in all connection boxes as shown
2 On double valve boxes overlay second set of pipes to connect exhausts of top valve
1 Fit P0001091 bulkhead connector to all spindle boxes at position shown, ensuring orientation of bulkhead is the same
2 Cut 8 pieces of black 6mm air pipe @230mm long and fit as show
3 Add P0001091 bulkhead to double slide connection boxes only as shown
1 Prepare 8 off P0001091 bulkheads with a piece of 32mm long 6mm black pipe added and one nut removed
2 Push pipe into cylinder fitting with nuts loose as shown
3 Apply force on fitting towards cylinder and run indicated nut to face to ensure no strain is added to fitting when tightening
4 Spin indicated nut to the connection box face and then tighten nuts
Fit remaining p0001091 bulkhead to double slide connection boxes as shown
Please ensure all looms created and run are identical on each spindle head and copy examples shown . Looms must be kept to minimal size to protect from debris during operation
1 Cut 8 off pieces of black air pipe @ 230mm and fit as shown to all connection boxes, noting pipe routing
2 Cut 8 off pieces of black 6mm air pipe @ 190mm and fit as shown to all connection boxes
1 Cut 4 off pieces of 6mm black airpipe @ 245mm and install in double slide connection boxes as shown, noting pipe routing
2 Cut 4 off pieces of 6mm black airpipe @ 205mm and install in double slide connection boxes as shown, noting pipe routing
1 Install 300hz cable from single slide spindle as shown (4 off)
2 Install 300hz cable from double slide spindle as shown (4 off)
1 Loom with spiral wrap as shown sensors from double plunge assembly
2 Loom with spiral wrap as shown sensors from single plunge assembly
Fit 2 off P0001093 stem elbows as shown then connect 4mm airpipes over length as shown to either connection ( these will be identified and tidied later on)
Repeat on remaining 3 double plunge connection boxes