R0015346 Conveyor blower system

Auteur avatarGareth Green | Dernière modification 5/06/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Pipe cutters

Pipe identification numbers


Parts Required


P0000046 Fitting: 'Y' Adaptor 6mm x 1

P0000053 6mm T (P16) x 1

P0000160 Fitting: Flow Controller In Line 6mm x 1


Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Connect Drive roller blower

use 6 x 4 mm black air pipe .


Use identifications of 2139


Connect blower elbow to in line flow regulator


Connect flow regulator to 6mm Y connector

Correct photo required please


Étape 3 - 6mm Y connector

6x4mm black air pipe .


From 6mm Y connector


1 pipe to run to saw connection . Leave trailing pipe 2 meters long with identification


1 pipe to run along indicated side of conveyor to feed top blowers

Correct photo required please



Étape 4 - 6mm Tee connection

Split feed pipe with 6mm Tee connector at upper bracket position


fit inline flow regulator before 6mm tee connector


run one feed pipe direct to blower

Correct photo required please



Étape 5 - Last blower feed

attach tie bases to top mount bracket


provide details to raise ecr to include drilling details


attach feed pipe to tie bases and feed last blower elbow

Correct photo required please



Étape 6 - Pneumatics test

Connect air feed to trailing 6mm pipe


Check all flow regulators are installed in the correct orientation


When flow regulators are fully closed, air should be stopped .


If air can only be regulated to a small flow, regulator is installed in the wrong orientation



Commentaires

Draft