Upgrade, Beckhoff, ZX3, ZX4, Control SystemUpgrade_ZX_Machine_to_Beckhoff_Drives_and_Control_ZX4.JPG
Introduction
The ZX3 and ZX4 machines that have control systems that pre-date the Beckhoff hardware now have an upgrade available. The upgrade will bring up-to-date hardware to the machines control system and drives. The control system and drives will be changed to Beckhoff. TwinCAT 3 PLC and AX8000 series drives.
Attention
Consulter le manuel d'instructions
Utiliser des chaussures de protection
Pour l'entretien, débranchez l'appareil du secteur
Avertissement générique
Haute Tension
Étape 1 - Preparation (Base)
Check through all parts lists and make sure that the parts that have been requested are the parts that are in the box. The picked parts should include all the consumable products that are in the BoMs (bolts, tie wraps, wires etc).
Once parts have been checked, they need to be handed to production for pre-assembly.
Ensure all information and drawing packs are available in the service job and in the relevant technical information boards on Monday.com. Link to Monday board for drawing packs here:
Before the upgrade is despatched to site, the servo system needs to be assembled and pre-wired in its enclosure.
Drill off Fan detail in right hand side of cabinet. A 114mm hole saw and arbor has been purchased for this.
Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage.
Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes).
Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site.
Plug in the 2x15m green etherCAT cables.
The enclosure bottom plate is left off to allow the cable entry on site.
*for detailed wiring information, please use drawing packs from Monday.com board.*
Étape 3 - Preperation (On-Site)
Parts
The parts should arrive on site, packed as a kit. Check the parts for any obvious signs of damage and check through to make sure you have received what was expected.
Expectations
Before starting any works, check in with the customer and make sure that all parties are aware of the scope of the work being undertaken. It is good to set expectations at this point, to keep clarity between you and the customer.
Starting the Job
...Ensure machine is turned off and properly isolated before starting any work!
Check machine condition and get pictures before starting any work. It may be useful to run the machine to check any inherent issues before the upgrade begins. After works have been started, it will not be possible to come back to this stage.
Étape 4 - Remove Components - MH (Electrical)
It is important to note that although the components are being removed from the machine, they are not to be thrown away. Please keep all parts in good condition and find a place to store them until the end of the upgrade process.
Where wiring needs to be disconnected, try and keep crimped ends attached so that the wires can be reused later in the upgrade process.
SX axis servo cablesfrom Saw cabinet through to SX axis motor
X axis servo cables from MH rear plug join to X axis motor
X axis servo cables from MH drop down panel to MH rear plug join
G axis stepper cable from MH drop down panel to MH rear plug join
Y, Z and R axis servo cables from MH drop down panel to servo motors
X, Y, Z and R axis servo cables from MH Cabinet to MH drop down panel
G axis stepper cable from MH cabinet to MH drop down panel
Étape 8 - Fit Parts - MH (Electrical)
...When fitting IO slices, try and place them in such a way that existing IO wiring will reach the terminals.
Parts to be fitted in MH cabinet:
Beckhoff IO Slices
Beckhoff IPC
Front End PC
24Vdc 10A Power Supply
3Pole 10A Breaker for Servo System
1Pole 3A Breaker for 24Vdc 10A Power Supply
Din Mount Network Switch
*For any IO wiring that will not reach the IO slices, terminals are provided in the kit. The terminals can be used to extend the wiring.*
Étape 9 - Fit Parts - Saw (Electrical)
...When fitting IO slices, try and place them in such a way that existing IO wiring will reach the terminals.
Parts to be fitted in Saw Cabinet:
Beckhoff IO Slices
Din Mount Network Switch
Étape 10 - Fit Parts - Transfer (Electrical)
...When fitting IO slices, try and place them in such a way that existing IO wiring will reach the terminals.
Parts to be fitted in Saw Infeed Cabinet:
Beckhoff IO Slices
Étape 11 - Fit Servo Cabinet
Position:
The servo cabinet will arrive pre-wired and have 4 feet fitted to the bottom. The cabinet needs to be placed at the rear of the MH outfeed, just after the first eject push cylinder. To get the cabinet inplace, the first fence panel will need to be removed. Eventually this fence panel will need to be cut to allow the cabinet door to open.
Fixing:
To fit the cabinet, first set the feet so that the top rear holes of the cabinet line up with the round bar frame of the MH outfeed. Once the holes line up, they can be drilled off and fixed.
Cables:
Étape 12 - Wiring Cabinets
Refer to drawings
Étape 13 - Run Machine Cabling
Étape 14 - Upgrade Console - MH
Étape 15 - Upgrade Console - Saw
Étape 16 - Terminate Machine Wiring
Étape 17 - Tidying and Checks
Commentaires
ennone0Draft
×
Erreur de saisie dans le nom du tutoriel
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #
Connexion
Pas encore enregistré ? Créez un compte pour profiter de toutes les fonctionnalités du service !