ZX5 Installation Procedure 2023 Part 2 : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
(Page créée avec « {{Tuto Details |Main_Picture=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_141423.png |Main_Picture_annotation={"version":"2.4.6","objects":[{"type":"image","versi... »)
 
Ligne 32 : Ligne 32 :
 
Tolerance 0.002" / 0.05mm
 
Tolerance 0.002" / 0.05mm
  
 
+
[https://stugaltd.monday.com/boards/3628350043/pulses/4665028475][[R0015311 Install and Align Datum rollers]]
[https://stugaltd.monday.com/boards/3628350043/pulses/4665028417][https://stuga.dokit.app/wiki/R0015311_Install_and_Align_Datum_rollers][[R0015311 Install and Align Datum rollers]]
 
  
 
<br /></translate>
 
<br /></translate>
Ligne 39 : Ligne 38 :
 
|Step_Picture_01=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_120538.png
 
|Step_Picture_01=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_120538.png
 
|Step_Picture_02=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_120511.png
 
|Step_Picture_02=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_120511.png
 +
|Step_Picture_03=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_145254.png
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Multi head levelling points</translate>
 
|Step_Title=<translate>Multi head levelling points</translate>
|Step_Content=<translate>https://stuga.dokit.app/w/R0015311_Install_and_Align_Datum_rollers</translate>
+
|Step_Content=<translate>#x axis machine levelling.  use a 2 meter straight edge between the indicated points and an engineers level on top to level this axis
 +
#Y axis levelling. Use an engineers level to straddle the 2 indicated points to level the y axis of the machine
 +
 
 +
[[R0015311 Install and Align Datum rollers]]
 +
 
 +
[[R0002913E Install and Align Rotary head Subframe]]
 +
 
 +
[[R0002913E Install and Align Rotary head Subframe PART 2]]
 +
 
 +
[[R0015046 Bench Assemble Infeed Clamps]]</translate>
 +
|Step_Picture_00=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_144304.png
 +
|Step_Picture_01=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_144314.png
 +
|Step_Picture_02=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_145254.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Alignment of Machining center to outfeed table</translate>
 +
|Step_Content=<translate>Machining  center is aligned to the outfeed using the following
 +
 
 +
 
 +
Grip pin setting jig
 +
 
 +
Laser level
 +
 
 +
2 meter straight edge
 +
 
 +
 
 +
X axis position is determined by hepco rail travel at full extent and center clamp bar within machining center. The gap here should be approximately 75mm.
 +
 
 +
 
 +
Y axis position is determined by the grip pin jig and the machining center backfence rollers. The grip pin jig must be used at 2 points for correct alignment . Infeed datum rollers and v notch datum rollers.
 +
 
 +
Ensure gripper pins fall freely and centrally into alignment jig when setting.
 +
 
 +
Only move Machining centre to adjust this position
 +
 
 +
 
 +
Height is determined by the datum horizontal rollers in the machining center and the blue rollers on the outfeed table. Out feed rollers and platform  should be less than  1mm below the Machining centre rollers
 +
 
 +
<br />
 +
 
 +
#position machining center roughly in place on the end of the outfeed table
 +
#level using previous step
 +
#once the module has been levelled, final levelling of the outfeed x axis can be done , as it uses the machining center as a datum to hold the laser level
 +
{{Warning|...Levels must be extremely accurate in the machining center  +- 1 division for this step to be accurate}}Place laser level in the rear datum roller section of the machining center
 +
 
 +
Position gripper carriage as close to the laser level as possible
 +
 
 +
Mark a horizontal line of the carriage plate as a height datum
 +
 
 +
Move the carriage to above the next section of frame feet and adjust the pair of jacking bolts to adjust line to be on laser level mark
 +
 
 +
Repeat this step above every pair of frame legs where jacking bolts are{{Warning|...Make sure frame bolts are accurately rotated when adjusting as pairs. If this isn't done, y axis level will be lost and unnecessary strain will be added to frame sections}}These steps will ensure the outfeed is now set on a dead flat plain
 +
 
 +
 
 +
4.  Use the pin jig to  adjust the position of the machining center to allow the gripper pins to align with the jig at all points along the back fence rollers. hepco beam should also be moved from in to the out position also to double check this jig setting
 +
 
 +
5. Use laser against machining center rollers to cast a laser line along the outfeed. Pull the gripper as close as possible to the laser, and mark a vertical line on the gripper where the laser dot falls.
 +
 
 +
Move the gripper to the end of the hepco rail and check if the laser stop still aligns on the vertical line previously marked . If it doesn't , grip pin alignment will need re  checking as it is crucial that both of these areas are correct
 +
 
 +
6 final height adjustment is set by using a 2 meter straight edge through the machining center rollers to the first set of rollers on the outfeed table. Machining center can be adjusted up or down to bring these rollers all onto  the same height plain (-1mm maximum)
 +
 
 +
 
 +
[[R0015028D ZX5 Hepco Beam Alignment Module C]]
 +
 
 +
[[R0015028D ZX5 Hepco Beam Alignment Module C part 2]]
 +
<br /></translate>
 +
|Step_Picture_00=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_144706.png
 +
|Step_Picture_01=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_145254.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Position Module A Infeed Table</translate>
 +
|Step_Content=<translate>Position Module A infeed table in front of Module B machining centre
 +
 
 +
 
 +
Use Back fence of module A and Module B as y axis alignment point
 +
 
 +
 
 +
Position X axis of Module A  frame close to B as shown
 +
 
 +
 
 +
Do not finalise alignment yet, use as rough position markers</translate>
 +
|Step_Picture_00=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_145835.png
 +
|Step_Picture_01=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_145254.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Machining centre Infeed levelling</translate>
 +
|Step_Content=<translate>Y axis of machining centre infeed . This is done on the indicated face of the arms using a level . Only level the indicated arms as these are the only ones controllable by the jacking feet positions
 +
 
 +
<nowiki>#</nowiki>Use a laser level placed on the levelled machining centre infeed rollers, and cast a laser line along the length of the infeed table. Ensure the beam is positioned so a reading can be taken from each circled point on the frame.  Take a measurement from the first circled point with a steel rule of the indicated area. Replicate this measurement at all points indicated along the frame  by Adjusting the legs in pairs to raise or lower the appropriate arm
 +
 
 +
 
 +
This will ensure the frame is level and flat
 +
 
 +
<br /></translate>
 +
|Step_Picture_00=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_150218.png
 +
|Step_Picture_01=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_150253.png
 +
|Step_Picture_02=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_150231.png
 +
|Step_Picture_03=ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_150243.png
 +
|Step_Picture_03_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":741,"height":361,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.81,"scaleY":0.81,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/a/a5/ZX5_Installation_Procedure_2023_Part_2_Screenshot_2023-12-05_150243.png","filters":[]}],"height":292,"width":600}
 +
|Step_Picture_04=ZX5_Installation_Procedure_2023_Screenshot_2023-12-05_145254.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Finalise alignment</translate>
 +
|Step_Content=<translate>Height of module A is determined by load rollers. 
 +
 
 +
Blue load rollers should be -1mm below Module B load rollers .  Adjust All jacking  points on module A the same amount to lift or lower the frame to match module B.
 +
 
 +
 
 +
Y axis alignment is achieved by using laser .  Position laser against back fence of module B and cast across Module A frame in front of backfences.  Adjust frame to achieve the same laser measurement at each individual backfence</translate>
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}
 
{{PageLang
 
{{PageLang
 +
|Language=en
 
|SourceLanguage=none
 
|SourceLanguage=none
 
|IsTranslation=0
 
|IsTranslation=0
|Language=en
 
 
}}
 
}}
 
{{Tuto Status
 
{{Tuto Status
 
|Complete=Draft
 
|Complete=Draft
 
}}
 
}}

Version du 5 décembre 2023 à 17:12

Auteur avatarGareth Green | Dernière modification 21/12/2023 par Gareth Green en cours de rédaction

Introduction

Key data for installation of ZX5


Dokit to generate consistency of installation


Quality checks for installation


Manufacturing data supply

Étape 1 - Check roller alignment

Check X axis alignment of horiczontal and vertical rollers using 2 meter straight edge and feeler gauges


Any discrepancy must be reported and rectified if present


Tolerance 0.002" / 0.05mm

[1]R0015311 Install and Align Datum rollers


Étape 2 - Multi head levelling points

  1. x axis machine levelling. use a 2 meter straight edge between the indicated points and an engineers level on top to level this axis
  2. Y axis levelling. Use an engineers level to straddle the 2 indicated points to level the y axis of the machine

R0015311 Install and Align Datum rollers

R0002913E Install and Align Rotary head Subframe

R0002913E Install and Align Rotary head Subframe PART 2

R0015046 Bench Assemble Infeed Clamps


Étape 3 - Alignment of Machining center to outfeed table

Machining center is aligned to the outfeed using the following


Grip pin setting jig

Laser level

2 meter straight edge


X axis position is determined by hepco rail travel at full extent and center clamp bar within machining center. The gap here should be approximately 75mm.


Y axis position is determined by the grip pin jig and the machining center backfence rollers. The grip pin jig must be used at 2 points for correct alignment . Infeed datum rollers and v notch datum rollers.

Ensure gripper pins fall freely and centrally into alignment jig when setting.

Only move Machining centre to adjust this position


Height is determined by the datum horizontal rollers in the machining center and the blue rollers on the outfeed table. Out feed rollers and platform should be less than 1mm below the Machining centre rollers


  1. position machining center roughly in place on the end of the outfeed table
  2. level using previous step
  3. once the module has been levelled, final levelling of the outfeed x axis can be done , as it uses the machining center as a datum to hold the laser level
...Levels must be extremely accurate in the machining center +- 1 division for this step to be accurate
Place laser level in the rear datum roller section of the machining center

Position gripper carriage as close to the laser level as possible

Mark a horizontal line of the carriage plate as a height datum

Move the carriage to above the next section of frame feet and adjust the pair of jacking bolts to adjust line to be on laser level mark

Repeat this step above every pair of frame legs where jacking bolts are
...Make sure frame bolts are accurately rotated when adjusting as pairs. If this isn't done, y axis level will be lost and unnecessary strain will be added to frame sections
These steps will ensure the outfeed is now set on a dead flat plain


4. Use the pin jig to adjust the position of the machining center to allow the gripper pins to align with the jig at all points along the back fence rollers. hepco beam should also be moved from in to the out position also to double check this jig setting

5. Use laser against machining center rollers to cast a laser line along the outfeed. Pull the gripper as close as possible to the laser, and mark a vertical line on the gripper where the laser dot falls.

Move the gripper to the end of the hepco rail and check if the laser stop still aligns on the vertical line previously marked . If it doesn't , grip pin alignment will need re checking as it is crucial that both of these areas are correct

6 final height adjustment is set by using a 2 meter straight edge through the machining center rollers to the first set of rollers on the outfeed table. Machining center can be adjusted up or down to bring these rollers all onto the same height plain (-1mm maximum)


R0015028D ZX5 Hepco Beam Alignment Module C

R0015028D ZX5 Hepco Beam Alignment Module C part 2


Étape 4 - Position Module A Infeed Table

Position Module A infeed table in front of Module B machining centre


Use Back fence of module A and Module B as y axis alignment point


Position X axis of Module A frame close to B as shown


Do not finalise alignment yet, use as rough position markers


Étape 5 - Machining centre Infeed levelling

Y axis of machining centre infeed . This is done on the indicated face of the arms using a level . Only level the indicated arms as these are the only ones controllable by the jacking feet positions

#Use a laser level placed on the levelled machining centre infeed rollers, and cast a laser line along the length of the infeed table. Ensure the beam is positioned so a reading can be taken from each circled point on the frame. Take a measurement from the first circled point with a steel rule of the indicated area. Replicate this measurement at all points indicated along the frame by Adjusting the legs in pairs to raise or lower the appropriate arm


This will ensure the frame is level and flat


Étape 6 - Finalise alignment

Height of module A is determined by load rollers.

Blue load rollers should be -1mm below Module B load rollers . Adjust All jacking points on module A the same amount to lift or lower the frame to match module B.


Y axis alignment is achieved by using laser . Position laser against back fence of module B and cast across Module A frame in front of backfences. Adjust frame to achieve the same laser measurement at each individual backfence

Commentaires

Draft