[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 29 : | Ligne 29 : | ||
P0001022 Regulator Bracket: to suit P0001008 | P0001022 Regulator Bracket: to suit P0001008 | ||
+ | |||
+ | A0000343 energy chain x 1 | ||
+ | |||
+ | A0000344 energy chain bracket set x 1 | ||
+ | |||
+ | D0015577 Fixed energy chain bracket x 1 | ||
<br /></translate> | <br /></translate> |
Instructions to install pneumatic connections to main frame
Auteur Gareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pas encore d'image
Instructions to install pneumatic connections to main frame
Tools require
Pipe cutters
Number identification
Flush cutters
Parts required
P0000010 Elbow Adaptor 6mm - 1/8 BSPT (Taper thread)
P0000160 Fitting: Flow Controller In Line 6mm
P0000551 6mm inline Quick Exhaust Fitting
P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge
P0001022 Regulator Bracket: to suit P0001008
A0000343 energy chain x 1
A0000344 energy chain bracket set x 1
D0015577 Fixed energy chain bracket x 1
All bolts to have Loctite 243 adhesive applied unless otherwise stated
All Threaded Pneumatic connections to have Loctite 570 applied
All bolts to be pen marked once adhesive applied and correct tension added
Material blower should be identified as 2399
P0000160 flow reg required to control flow onto sensors
Connect to active port ln valve bank (4)
Feed pipes from valve bank should be run to transfer arm location 4
Identifications will be
2319
2309
2299
Connect to active port on valve bank (4)
Fit A000343 energy chain @44? links
A0000344 energy chain brackets as shown
Mount to D0015577 fixed bracket and attach to support arm as shown
Must have a P0000551 qev fitted to each line
Has regulation on active position
Identification
2211 feeds from valve bank (2) to cylinder home port (nose)
2212 feeds from base of cylinder to reg out port
2219 feeds from reg in port to active port on valve bank (4)
P0000551 2 off must be fitted to 2211 and 2212 close to cylinder
Identification 1479
Connects to active port on valve bank (4)
Ensure enough loom to allow full range of movement
Identification
1461 and 1469
Roller bed is lifted at home position
1461 to home port on valve bank (2)
1469 to active port on valve bank (4)
Identification 2419
Must have flow regulation P0000160
Connect to active port (4) on valve bank
Gripper height is lifted for home position
identification
1311 Home port of valve bank (2) to nose of cylinder
1312 base of cylinder to out port on regulator
1319 In port of regulator to active port on valve bank (4)
Connect 12mm blue airpipe from valve banks to end of frame for machine connections
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #