RMZX505 Under Machining Centre Fence : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
(Page créée avec « {{Tuto Details |Description=<translate>Fitting removable panels to front and rear of machining centre opening</translate> |Categories=Administration |Tags=Compliance, Mesh... »)
 
 
Ligne 1 : Ligne 1 :
 
{{Tuto Details
 
{{Tuto Details
 +
|Main_Picture=RMZX505_Under_Machining_Centre_Fence_IMG_9680.JPG
 
|Description=<translate>Fitting removable panels to front and rear of machining centre opening</translate>
 
|Description=<translate>Fitting removable panels to front and rear of machining centre opening</translate>
 
|Categories=Administration
 
|Categories=Administration
 
|Tags=Compliance, Mesh
 
|Tags=Compliance, Mesh
 
}}
 
}}
<translate>= Objective =
+
<translate>=Objective=
 
To fit a guard fence to cover the area under the machining centre front and rear where the swarf bins are removed and emptied. The guard must comply with BS EN ISO 13857. The panel should be removable, but will need a tool. The guard fixings must be retained on the guard. The operators must be trained in the correct use of them
 
To fit a guard fence to cover the area under the machining centre front and rear where the swarf bins are removed and emptied. The guard must comply with BS EN ISO 13857. The panel should be removable, but will need a tool. The guard fixings must be retained on the guard. The operators must be trained in the correct use of them
 +
 +
= Procedure =
 +
 +
# Drill and tap 2 off mounting holes front and rear
 +
# Fit the guards
 +
 +
= Testing / Training =
 +
 +
* Ensure the guards are easily removable with the correct key device
 +
* Train the operators
 +
 +
= Completion =
 +
This modification is expected to take no longer than 1 hour to complete.
 +
 +
Completion is when:
 +
 +
* Testing completed
 +
* Device Magic app updated for this task, with time taken and photo evidence recorded
 +
 
<br /></translate>
 
<br /></translate>
 
{{PageLang
 
{{PageLang
 +
|Language=en
 
|SourceLanguage=none
 
|SourceLanguage=none
 
|IsTranslation=0
 
|IsTranslation=0
|Language=en
 
 
}}
 
}}
 
{{AddComments}}
 
{{AddComments}}

Version actuelle datée du 26 juillet 2023 à 10:48

Auteur avatarGareth Green | Dernière modification 26/07/2023 par Gareth Green en cours de rédaction

RMZX505 Under Machining Centre Fence IMG 9680.JPG

Fitting removable panels to front and rear of machining centre opening

Objective

To fit a guard fence to cover the area under the machining centre front and rear where the swarf bins are removed and emptied. The guard must comply with BS EN ISO 13857. The panel should be removable, but will need a tool. The guard fixings must be retained on the guard. The operators must be trained in the correct use of them

Procedure

  1. Drill and tap 2 off mounting holes front and rear
  2. Fit the guards

Testing / Training

  • Ensure the guards are easily removable with the correct key device
  • Train the operators

Completion

This modification is expected to take no longer than 1 hour to complete.

Completion is when:

  • Testing completed
  • Device Magic app updated for this task, with time taken and photo evidence recorded


Commentaires

Draft