[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 15 : | Ligne 15 : | ||
− | <u>'''Parts Required'''</u></translate> | + | <u>'''Parts Required'''</u> |
+ | |||
+ | B0000184 Journal Cap Seal 34 x 4 | ||
+ | |||
+ | B0000185 Double Row Long Stud Journal Eccentric x 2 | ||
+ | |||
+ | B0000186 Double Row Long Stud Journal Concentric x2 | ||
+ | |||
+ | B0001102 Double Edge Spacer Slide and Beam 7600mm x 1 | ||
+ | |||
+ | D0015072 Carriage Plate x 1 | ||
+ | |||
+ | D0015492 Vertical Beam Adjustment Plate x5 | ||
+ | |||
+ | D0015493 Lateral Beam Adjustment Plate x 5 | ||
+ | |||
+ | P0000200 Elbow Adaptor 6mm - M5 x 1 | ||
+ | |||
+ | F0000529 T-Nut M6 (slot 10) x 3 | ||
+ | |||
+ | F0000530 T-nut M8 (slot 10) x1</translate> | ||
}} | }} | ||
{{Materials}} | {{Materials}} | ||
Ligne 27 : | Ligne 47 : | ||
Pen mark all fasteners to show finalised</translate> | Pen mark all fasteners to show finalised</translate> | ||
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png | |Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Additional spacer</translate> | ||
+ | |Step_Content=<translate>Ensure additional spacer is fitted to jigs when using for alignment on module E</translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
Ligne 51 : | Ligne 75 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Level x axis between jigs</translate> | |Step_Title=<translate>Level x axis between jigs</translate> | ||
− | |Step_Content=<translate>Using a 2 meter straight edge , the jigs should be levelled to each other as shown</translate> | + | |Step_Content=<translate>Using a 2 meter straight edge , the jigs should be levelled to each other as shown. |
+ | |||
+ | |||
+ | Identify which Jig is the lowest point by using the straight edge and level . Adjust the lower height jigs to match the highest point one. This is to ensure that the height is maintained as much as possible between blue mounting bar and jig top face | ||
+ | |||
+ | |||
+ | When a jig is adjusted for height, i will need rechecking to see if the other previous levelled plains have moved. If so, re adjust to bring jig level in all axis</translate> | ||
|Step_Picture_00=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105626.png | |Step_Picture_00=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105626.png | ||
|Step_Picture_01=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105642.png | |Step_Picture_01=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105642.png | ||
+ | |Step_Picture_02=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105206.png | ||
+ | |Step_Picture_03=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_105215.png | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Wire line for setting straightness</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>A wire line should be used for setting the straightness of the jigs along the x axis |
+ | |||
+ | |||
+ | Use dokit [[Alignment guide using wire line]] for correct process to set up</translate> | ||
+ | |Step_Picture_00=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_110721.png | ||
+ | |Step_Picture_01=R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_110734.png | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Quality Check</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Qc Double check required at this point from Supervisor that all alignment is correct.</translate> |
+ | |Step_Picture_00=R0000711_Rotary_Base_Assembly_quality-assurance-testing.png | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Position Hepc double edge slide</translate> | ||
+ | |Step_Content=<translate>B0001102 can now be assembled on jigs . | ||
+ | |||
+ | |||
+ | These beams are paired so check you have been issued a set correctly | ||
+ | |||
+ | |||
+ | Pairs can be identified as follows | ||
+ | |||
+ | |||
+ | 1 and 1 | ||
+ | |||
+ | 2 and 2 | ||
+ | |||
+ | A and A | ||
+ | |||
+ | B and B</translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step |
Instructions to correctly align and mount hepco drive beam
Auteur Gareth Green | Dernière modification 17/10/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions to correctly align and mount hepco drive beam
R0015029D_Hepco_Beam_Alignment_Screenshot_2023-07-03_084430.png
Tools Required
Engineers level
Parts Required
B0000184 Journal Cap Seal 34 x 4
B0000185 Double Row Long Stud Journal Eccentric x 2
B0000186 Double Row Long Stud Journal Concentric x2
B0001102 Double Edge Spacer Slide and Beam 7600mm x 1
D0015072 Carriage Plate x 1
D0015492 Vertical Beam Adjustment Plate x5
D0015493 Lateral Beam Adjustment Plate x 5
P0000200 Elbow Adaptor 6mm - M5 x 1
F0000529 T-Nut M6 (slot 10) x 3
F0000530 T-nut M8 (slot 10) x1Always Use Loctite 243 on all fasteners
Always use Loctite 570 on all threaded pneumatic connections
Pen mark all fasteners to show finalised
Ensure additional spacer is fitted to jigs when using for alignment on module E
Mount setting jigs to channel section in positions shown using M8 cap head bolts and heavy washers
Position one shown will require fixing points drilling to channel section . Drill M8 and position to measurement shown of 430mm
Use an engineers level to individually adjust each jig to be level on both axis
Using a 2 meter straight edge , the jigs should be levelled to each other as shown.
Identify which Jig is the lowest point by using the straight edge and level . Adjust the lower height jigs to match the highest point one. This is to ensure that the height is maintained as much as possible between blue mounting bar and jig top face
When a jig is adjusted for height, i will need rechecking to see if the other previous levelled plains have moved. If so, re adjust to bring jig level in all axis
A wire line should be used for setting the straightness of the jigs along the x axis
Use dokit Alignment guide using wire line for correct process to set up
Qc Double check required at this point from Supervisor that all alignment is correct.
B0001102 can now be assembled on jigs .
These beams are paired so check you have been issued a set correctly
Pairs can be identified as follows
1 and 1
2 and 2
A and A
B and B
en none 0 Draft