The machine will be delivered in the following modules, that should be unloaded from the lorry in this order | The machine will be delivered in the following modules, that should be unloaded from the lorry in this order | ||
+ | #Electrical Cabinet | ||
#Machining centre base module (1.8 x 2.2m) | #Machining centre base module (1.8 x 2.2m) | ||
− | + | #Infeed module (2.4 x 9.0m) | |
− | #Infeed module (2.4 x | ||
− | |||
− | |||
<br /></translate> | <br /></translate> | ||
Ligne 32 : | Ligne 30 : | ||
|Step_Title=<translate>Lorry Loading Schedule</translate> | |Step_Title=<translate>Lorry Loading Schedule</translate> | ||
|Step_Content=<translate>The Infeed table in particular needs to be loaded in such a way so it can be unloaded in the correct direction | |Step_Content=<translate>The Infeed table in particular needs to be loaded in such a way so it can be unloaded in the correct direction | ||
+ | |||
+ | <br /></translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Machine Arrival</translate> | ||
+ | |Step_Content=<translate>'''Thursday PM''' | ||
+ | |||
+ | Unload machining centre and store in Glass shed | ||
+ | |||
+ | Unload infeed and cover with Tarpaulin | ||
+ | |||
+ | Unload electrical cabinet and store inside | ||
<br /></translate> | <br /></translate> | ||
Ligne 37 : | Ligne 47 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Remove the Soenen Machine</translate> | |Step_Title=<translate>Remove the Soenen Machine</translate> | ||
− | |Step_Content=<translate>''' | + | |Step_Content=<translate>'''Friday''' |
+ | |||
+ | remove the Soenen machine, leaving the large outfeed conveyor tables | ||
The Brackets on the outfeed tables will be used for the Stuga conveyors</translate> | The Brackets on the outfeed tables will be used for the Stuga conveyors</translate> | ||
Ligne 51 : | Ligne 63 : | ||
Using these datum points, mark the position of the remainder of the floor pads | Using these datum points, mark the position of the remainder of the floor pads | ||
− | {{Pin|...}}<br /></translate> | + | {{Pin|...Note this may be a large quick set pad}}<br /></translate> |
|Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Floor_Datum_2.jpg | |Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Floor_Datum_2.jpg | ||
|Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_4.jpg | |Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_4.jpg | ||
Ligne 65 : | Ligne 77 : | ||
|Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_2.jpg | |Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_2.jpg | ||
|Step_Picture_02=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_3.jpg | |Step_Picture_02=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_3.jpg | ||
− | |||
− | |||
− | |||
− | |||
− | |||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Prepare the Machine Pads / Piles</translate> | |Step_Title=<translate>Prepare the Machine Pads / Piles</translate> | ||
− | |Step_Content=<translate>'''Friday''':{{Idea|...Using shuttering in the pad holes will enable the height of the pad to be increased to correct the "run off" of the floor.}} | + | |Step_Content=<translate>'''Friday''':{{Idea|...Using shuttering in the pad holes will enable the height of the pad to be increased to correct the "run off" of the floor.}}{{Info|...this instruction can be ignored if a large pad is set}} |
*Pad size 300mm x 300mm (or similar) | *Pad size 300mm x 300mm (or similar) | ||
Ligne 83 : | Ligne 90 : | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate>Prepare | + | |Step_Title=<translate>Prepare transport axle</translate> |
− | |Step_Content=<translate> | + | |Step_Content=<translate>Stuga will supply a wheeled all-terrain axle |
+ | |||
+ | this axle is designed to form a "wheelbarrow" using the forklift as the driver / opposite end. This will enable the heavy machine units to be carefully wheeled over the rough terrain | ||
− | + | {{Warning|...Take care to attach the axle to the load correctly and securely}}<br /></translate> | |
− | |||
}} | }} | ||
{{Tuto Step | {{Tuto Step |
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Auteur Gareth Green | Dernière modification 22/02/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Saje_uPVC_Unloading_Process_IMG_7330_1_.jpg
Access for machinery is limited at the Saje factory.
The machine will be delivered in the following modules, that should be unloaded from the lorry in this order
The Infeed table in particular needs to be loaded in such a way so it can be unloaded in the correct direction
Thursday PM
Unload machining centre and store in Glass shed
Unload infeed and cover with Tarpaulin
Unload electrical cabinet and store inside
Friday
remove the Soenen machine, leaving the large outfeed conveyor tables
The Brackets on the outfeed tables will be used for the Stuga conveyors
The datum points for loading have already been marked on the floor.
Using these datum points, mark the position of the remainder of the floor pads
Stuga will supply a wheeled all-terrain axle
this axle is designed to form a "wheelbarrow" using the forklift as the driver / opposite end. This will enable the heavy machine units to be carefully wheeled over the rough terrain
Including the chop saw table
Leaving a clear route for the 2.4m x 7.5m table to roll in
If possible, improve the access pathway.
Potentially find a ramp system for the step into the unit
Monday:
Lorry to reverse along right side of building (when viewed from front)
This allow easy unloading access for forklift to unload to ground, and align components with door
The machining centre should be unloaded first
The guard is a clam shell design that encases the machine in 2 parts from front and rear
Conveyor table should attach to existing Soenen Brackets
Position of conveyor 1 adjusted to machining centre, leaving gap of 25mm
Height adjust on Soenen Brackets
Conveyor table should attach to existing Soenen Brackets
Additional leg for long conveyor to support
Position of conveyor 2 adjusted to Conveyor 1, leaving gap of 10mm
Height adjust on Soenen Brackets
Remove old Conveyor control back plate
Premade Backplates fit inside
Rewire as indicated in drawings
en none 0 Draft