(Page créée avec « {{Tuto Details |Description=<translate>Process for unloading and locating Autoflow Mk4 machine in Saje upvc</translate> |Categories=Maintenance |Difficulty=Hard |Duration=... ») |
|||
(6 révisions intermédiaires par le même utilisateur non affichées) | |||
Ligne 1 : | Ligne 1 : | ||
{{Tuto Details | {{Tuto Details | ||
+ | |Main_Picture=Saje_uPVC_Unloading_Process_IMG_7330_1_.jpg | ||
|Description=<translate>Process for unloading and locating Autoflow Mk4 machine in Saje upvc</translate> | |Description=<translate>Process for unloading and locating Autoflow Mk4 machine in Saje upvc</translate> | ||
|Categories=Maintenance | |Categories=Maintenance | ||
Ligne 11 : | Ligne 12 : | ||
The machine will be delivered in the following modules, that should be unloaded from the lorry in this order | The machine will be delivered in the following modules, that should be unloaded from the lorry in this order | ||
− | # Machining centre base module (1.8 x 2.2m | + | #Electrical Cabinet |
− | + | #Machining centre base module (1.8 x 2.2m) | |
− | # Infeed module (2.4 x | + | #Infeed module (2.4 x 9.0m) |
− | + | ||
+ | <br /></translate> | ||
+ | }} | ||
+ | {{Materials | ||
+ | |ItemList={{ItemList | ||
+ | |Item=Forklift Extensions | ||
+ | }} | ||
+ | |Prerequisites={{Prerequisites}} | ||
+ | }} | ||
+ | {{EPI | ||
+ | |EPI=use-protective-footwear, use-protective-clothing, use-protective-headgear | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Lorry Loading Schedule</translate> | ||
+ | |Step_Content=<translate>The Infeed table in particular needs to be loaded in such a way so it can be unloaded in the correct direction | ||
+ | |||
+ | <br /></translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Machine Arrival</translate> | ||
+ | |Step_Content=<translate>'''Thursday PM''' | ||
+ | |||
+ | Unload machining centre and store in Glass shed | ||
+ | |||
+ | Unload infeed and cover with Tarpaulin | ||
+ | |||
+ | Unload electrical cabinet and store inside | ||
<br /></translate> | <br /></translate> | ||
}} | }} | ||
− | |||
− | |||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Remove the Soenen Machine</translate> | |Step_Title=<translate>Remove the Soenen Machine</translate> | ||
− | |Step_Content=<translate> | + | |Step_Content=<translate>'''Friday''' |
+ | |||
+ | remove the Soenen machine, leaving the large outfeed conveyor tables | ||
The Brackets on the outfeed tables will be used for the Stuga conveyors</translate> | The Brackets on the outfeed tables will be used for the Stuga conveyors</translate> | ||
Ligne 36 : | Ligne 63 : | ||
Using these datum points, mark the position of the remainder of the floor pads | Using these datum points, mark the position of the remainder of the floor pads | ||
− | {{Pin|...}}<br /></translate> | + | {{Pin|...Note this may be a large quick set pad}}<br /></translate> |
|Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Floor_Datum_2.jpg | |Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Floor_Datum_2.jpg | ||
|Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_4.jpg | |Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_4.jpg | ||
|Step_Picture_02=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Inner_Feet_Dims.jpg | |Step_Picture_02=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Inner_Feet_Dims.jpg | ||
|Step_Picture_03=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Inner_Feet_Dims.jpg | |Step_Picture_03=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Inner_Feet_Dims.jpg | ||
+ | |Step_Picture_03_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":4,"top":-78,"width":471,"height":732,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1.1,"scaleY":1.1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/a/ae/Saje_uPVC_Unloading_Process_Sturtz_Infeed_Inner_Feet_Dims.jpg","filters":[]}],"height":449.6487119437939,"width":600} | ||
+ | |Step_Picture_04=Saje_uPVC_Unloading_Process_Sturtz_Infeed_All_Pads.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Triangulation for Infeed Pads</translate> | |Step_Title=<translate>Triangulation for Infeed Pads</translate> | ||
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Pictures show triangulation distances.</translate> |
|Step_Picture_00=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_1.jpg | |Step_Picture_00=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_1.jpg | ||
|Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_2.jpg | |Step_Picture_01=Saje_uPVC_Unloading_Process_Sturtz_Infeed_Triangulation_2.jpg | ||
Ligne 51 : | Ligne 80 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Prepare the Machine Pads / Piles</translate> | |Step_Title=<translate>Prepare the Machine Pads / Piles</translate> | ||
− | |Step_Content=<translate>{{Idea|...Using shuttering in the pad holes will enable the height of the pad to be increased to correct the "run off" of the floor.}} | + | |Step_Content=<translate>'''Friday''':{{Idea|...Using shuttering in the pad holes will enable the height of the pad to be increased to correct the "run off" of the floor.}}{{Info|...this instruction can be ignored if a large pad is set}} |
− | * Pad size 300mm x 300mm (or similar) | + | *Pad size 300mm x 300mm (or similar) |
− | * Pad Depth 300-500mm | + | *Pad Depth 300-500mm |
− | * Use shuttering or large diameter soil pipe | + | *Use shuttering or large diameter soil pipe |
− | * Find the highest point, string a level agcross | + | *Find the highest point, string a level agcross to the other pads |
− | *</translate> | + | *Fill shuttering with quick set cement to +/- 15mm of level |
+ | {{Idea|...The machining table has levelling feet, but the run off of the current cow shed floor may prove challenging for the range of the levelling. Using the shuttering to create taller plies will solve this problem easily and inexpensively}}<br /></translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate>Prepare | + | |Step_Title=<translate>Prepare transport axle</translate> |
− | |Step_Content=<translate> | + | |Step_Content=<translate>Stuga will supply a wheeled all-terrain axle |
+ | |||
+ | this axle is designed to form a "wheelbarrow" using the forklift as the driver / opposite end. This will enable the heavy machine units to be carefully wheeled over the rough terrain | ||
− | + | {{Warning|...Take care to attach the axle to the load correctly and securely}}<br /></translate> | |
− | |||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
Ligne 76 : | Ligne 107 : | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate> | + | |Step_Title=<translate>Clear Outside Unloading Area</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>The full width of this route will need to be cleared</translate> |
+ | |Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Rear.jpg | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Imporvements to step into building</translate> | ||
+ | |Step_Content=<translate>If possible, improve the access pathway. | ||
+ | |||
+ | Potentially find a ramp system for the step into the unit</translate> | ||
+ | |Step_Picture_00=Saje_uPVC_Unloading_Process_Step_into_Saje_Rear.jpg | ||
+ | |Step_Picture_01=Saje_uPVC_Unloading_Process_Saje_Rear.jpg | ||
+ | |Step_Picture_01_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":-316,"top":-396,"width":4032,"height":3024,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.3,"scaleY":0.3,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/c/c0/Saje_uPVC_Unloading_Process_Saje_Rear.jpg","filters":[]}],"height":449.75922953451044,"width":600} | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Lorry to reverse along RHS of building</translate> | ||
+ | |Step_Content=<translate>'''Monday''': | ||
+ | |||
+ | Lorry to reverse along right side of building (when viewed from front) | ||
+ | |||
+ | This allow easy unloading access for forklift to unload to ground, and align components with door | ||
+ | |||
+ | <br /></translate> | ||
+ | |Step_Picture_00=Saje_uPVC_Unloading_Process_Saje_Rear_LHS.jpg | ||
+ | |Step_Picture_01=Saje_uPVC_Unloading_Process_Saje_Unloading_area.jpg | ||
+ | |Step_Picture_02=Saje_uPVC_Unloading_Process_2022-10-04_08-52-55.jpg | ||
+ | |Step_Picture_03=Saje_uPVC_Unloading_Process_2022-10-04_08-55-59.jpg | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Machining Centre</translate> | ||
+ | |Step_Content=<translate>The machining centre should be unloaded first</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Machining Centre Guard</translate> | ||
+ | |Step_Content=<translate>The guard is a clam shell design that encases the machine in 2 parts from front and rear</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Infeed Table</translate> | ||
+ | |Step_Content=<translate>* Infeed should lifted to align with rear door | ||
+ | * Bogey on lead end | ||
+ | * Forlift moves to rear end | ||
+ | * Forklift to shunt infeed able into factory | ||
+ | * 2 Off pallet trucks to manouvre into position</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Table1</translate> | ||
+ | |Step_Content=<translate>Conveyor table should attach to existing Soenen Brackets | ||
+ | |||
+ | Position of conveyor 1 adjusted to machining centre, leaving gap of 25mm | ||
+ | |||
+ | Height adjust on Soenen Brackets</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Table2</translate> | ||
+ | |Step_Content=<translate>Conveyor table should attach to existing Soenen Brackets | ||
+ | |||
+ | Additional leg for long conveyor to support | ||
+ | |||
+ | Position of conveyor 2 adjusted to Conveyor 1, leaving gap of 10mm | ||
+ | |||
+ | Height adjust on Soenen Brackets<br /></translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Control Cabinets</translate> | ||
+ | |Step_Content=<translate>Remove old Conveyor control back plate | ||
+ | |||
+ | Premade Backplates fit inside | ||
+ | |||
+ | Rewire as indicated in drawings</translate> | ||
+ | |Step_Picture_00=Saje_uPVC_Unloading_Process_Soenen_Conveyor_Cabinet.jpg | ||
}} | }} | ||
{{Notes}} | {{Notes}} | ||
{{PageLang | {{PageLang | ||
+ | |Language=en | ||
|SourceLanguage=none | |SourceLanguage=none | ||
|IsTranslation=0 | |IsTranslation=0 | ||
− | |||
}} | }} | ||
{{Tuto Status | {{Tuto Status | ||
|Complete=Draft | |Complete=Draft | ||
}} | }} |
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Auteur Gareth Green | Dernière modification 22/02/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Saje_uPVC_Unloading_Process_IMG_7330_1_.jpg
Access for machinery is limited at the Saje factory.
The machine will be delivered in the following modules, that should be unloaded from the lorry in this order
The Infeed table in particular needs to be loaded in such a way so it can be unloaded in the correct direction
Thursday PM
Unload machining centre and store in Glass shed
Unload infeed and cover with Tarpaulin
Unload electrical cabinet and store inside
Friday
remove the Soenen machine, leaving the large outfeed conveyor tables
The Brackets on the outfeed tables will be used for the Stuga conveyors
The datum points for loading have already been marked on the floor.
Using these datum points, mark the position of the remainder of the floor pads
Stuga will supply a wheeled all-terrain axle
this axle is designed to form a "wheelbarrow" using the forklift as the driver / opposite end. This will enable the heavy machine units to be carefully wheeled over the rough terrain
Including the chop saw table
Leaving a clear route for the 2.4m x 7.5m table to roll in
If possible, improve the access pathway.
Potentially find a ramp system for the step into the unit
Monday:
Lorry to reverse along right side of building (when viewed from front)
This allow easy unloading access for forklift to unload to ground, and align components with door
The machining centre should be unloaded first
The guard is a clam shell design that encases the machine in 2 parts from front and rear
Conveyor table should attach to existing Soenen Brackets
Position of conveyor 1 adjusted to machining centre, leaving gap of 25mm
Height adjust on Soenen Brackets
Conveyor table should attach to existing Soenen Brackets
Additional leg for long conveyor to support
Position of conveyor 2 adjusted to Conveyor 1, leaving gap of 10mm
Height adjust on Soenen Brackets
Remove old Conveyor control back plate
Premade Backplates fit inside
Rewire as indicated in drawings