[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 21 : | Ligne 21 : | ||
}} | }} | ||
{{Materials | {{Materials | ||
− | |ItemList={{ItemList}} | + | |ItemList={{ItemList |
+ | |Item=Forklift Extensions | ||
+ | }} | ||
+ | |Prerequisites={{Prerequisites}} | ||
}} | }} | ||
{{EPI | {{EPI | ||
Ligne 117 : | Ligne 120 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Machining Centre</translate> | |Step_Title=<translate>Machining Centre</translate> | ||
− | |Step_Content=<translate>The machining centre</translate> | + | |Step_Content=<translate>The machining centre should be unloaded first</translate> |
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Machining Centre Guard</translate> | |Step_Title=<translate>Machining Centre Guard</translate> | ||
− | |Step_Content=<translate>The | + | |Step_Content=<translate>The guard is a clam shell design that encases the machine in 2 parts from front and rear</translate> |
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Infeed Table</translate> | ||
+ | |Step_Content=<translate>* Infeed should lifted to align with rear door | ||
+ | * Bogey on lead end | ||
+ | * Forlift moves to rear end | ||
+ | * Forklift to shunt infeed able into factory | ||
+ | * 2 Off pallet trucks to manouvre into position</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Level machine to working height</translate> | ||
+ | |Step_Content=<translate>Working height should be around 1m | ||
+ | |||
+ | Fix to floor with M12 x 150 Sleeve Anchor</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Position Infeed Table</translate> | ||
+ | |Step_Content=<translate>Level lifting rollers to infeed roller height +0mm / -0.5mm | ||
+ | |||
+ | Align with rear fence of machine with laser level +/- 2.5mm over 7500mm | ||
+ | |||
+ | Fix to floor with M12 x 150 Sleeve Anchor</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Table1</translate> | ||
+ | |Step_Content=<translate>Conveyor table should attach to existing Soenen Brackets | ||
+ | |||
+ | Position of conveyor 1 adjusted to machining centre, leaving gap of 25mm | ||
+ | |||
+ | Height adjuston Soenen Brackets</translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Table2</translate> | ||
+ | |Step_Content=<translate>Conveyor table should attach to existing Soenen Brackets | ||
+ | |||
+ | Additional leg for long conveyor to support | ||
+ | |||
+ | Position of conveyor 2 adjusted to Conveyor 1, leaving gap of 10mm | ||
+ | |||
+ | <br /></translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Infeed to Control Cabinet Cabling</translate> | ||
+ | |Step_Content=<translate></translate> | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Conveyor Control Cabinets</translate> | ||
+ | |Step_Content=<translate>Remove old Conveyor control back plate | ||
+ | |||
+ | Premade Backplates fit inside | ||
+ | |||
+ | Rewire as indicated in drawings</translate> | ||
+ | |Step_Picture_00=Saje_uPVC_Unloading_Process_Soenen_Conveyor_Cabinet.jpg | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Mains Services</translate> | ||
+ | |Step_Content=<translate>Connect to air, electric, Network</translate> | ||
}} | }} | ||
{{Notes}} | {{Notes}} |
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Auteur Gareth Green | Dernière modification 22/02/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Process for unloading and locating Autoflow Mk4 machine in Saje upvc
Saje_uPVC_Unloading_Process_IMG_7330_1_.jpg
Access for machinery is limited at the Saje factory.
The machine will be delivered in the following modules, that should be unloaded from the lorry in this order
Wed / Thur before unloading, remove the Soenen machine, leaving the large outfeed conveyor tables
The Brackets on the outfeed tables will be used for the Stuga conveyors
The datum points for loading have already been marked on the floor.
Using these datum points, mark the position of the remainder of the floor pads
Window loading bogeys (3 off) to be prepared on a rigid base to allow one end of machine infeed frame to rest on them
The forklift will lift and push from the other end
Including the chop saw table
Leaving a clear route for the 2.4m x 7.5m table to roll in
If possible, improve the access pathway.
Potentially find a ramp system for the step into the unit
Monday:
Lorry to reverse along left side of building (when viewed from front)
This allow easy unloading access for forklift to unload to ground, and align components with door
The machining centre should be unloaded first
The guard is a clam shell design that encases the machine in 2 parts from front and rear
Working height should be around 1m
Fix to floor with M12 x 150 Sleeve Anchor
Level lifting rollers to infeed roller height +0mm / -0.5mm
Align with rear fence of machine with laser level +/- 2.5mm over 7500mm
Fix to floor with M12 x 150 Sleeve Anchor
Conveyor table should attach to existing Soenen Brackets
Position of conveyor 1 adjusted to machining centre, leaving gap of 25mm
Height adjuston Soenen Brackets
Conveyor table should attach to existing Soenen Brackets
Additional leg for long conveyor to support
Position of conveyor 2 adjusted to Conveyor 1, leaving gap of 10mm
Remove old Conveyor control back plate
Premade Backplates fit inside
Rewire as indicated in drawings
Connect to air, electric, Network
en none 0 Draft