[version en cours de rédaction] | [version en cours de rédaction] |
(5 révisions intermédiaires par le même utilisateur non affichées) | |||
Ligne 5 : | Ligne 5 : | ||
|Duration=3 | |Duration=3 | ||
|Duration-type=day(s) | |Duration-type=day(s) | ||
− | |Tags=6.5m, Extension, Upgrade | + | |Tags=6.5m, Extension, Upgrade, 6.5 |
}} | }} | ||
{{Introduction | {{Introduction | ||
Ligne 37 : | Ligne 37 : | ||
− | On a bench, remove Gearbox/motor assembly's and replace the pinion gears ( | + | On a bench, remove Gearbox/motor assembly's and replace the pinion gears (item 1), adding a small amount of Loctite on grubscrew when re-tightening. |
Ligne 50 : | Ligne 50 : | ||
− | Leave the x6 Journal covers off for now.</translate> | + | Leave the x6 Journal covers off for now (item 2).</translate> |
|Step_Picture_00=Flowline_6_to_6o5m_Extension_2.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_2.jpg | ||
+ | |Step_Picture_00_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":800,"height":450,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.75,"scaleY":0.75,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/thumb/2/21/Flowline_6_to_6o5m_Extension_2.jpg/800px-Flowline_6_to_6o5m_Extension_2.jpg","filters":[]},{"type":"wfnumberedbullet","version":"2.4.6","originX":"left","originY":"top","left":211,"top":156,"width":25,"height":25,"fill":"rgb(0,0,0)","stroke":"#FF0000","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"objects":[{"type":"circle","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":24,"height":24,"fill":"#FF0000","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":12,"startAngle":0,"endAngle":6.283185307179586},{"type":"text","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":7.79,"height":15.82,"fill":"rgba(255,255,255,255)","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"1","fontSize":14,"fontWeight":"normal","fontFamily":"arial","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"styles":{} }],"number":1},{"type":"wfnumberedbullet","version":"2.4.6","originX":"left","originY":"top","left":125,"top":80,"width":25,"height":25,"fill":"rgb(0,0,0)","stroke":"#FF0000","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"objects":[{"type":"circle","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":24,"height":24,"fill":"#FF0000","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":12,"startAngle":0,"endAngle":6.283185307179586},{"type":"text","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":7.79,"height":15.82,"fill":"rgba(255,255,255,255)","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"2","fontSize":14,"fontWeight":"normal","fontFamily":"arial","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"styles":{} }],"number":2}],"height":338,"width":600} | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
Ligne 79 : | Ligne 80 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Fit Extensions</translate> | |Step_Title=<translate>Fit Extensions</translate> | ||
− | |Step_Content=<translate>Fit extension box sections using 6mm capheads....and locknuts where accessible for extra security.</translate> | + | |Step_Content=<translate>Fit angle bracket to extension box sections using 6mm capheads....and locknuts where accessible for extra security (pic). |
+ | |||
+ | |||
+ | Do not fit to mainframe yet....only use G clamps until Hepco rail is attached.</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_6.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_6.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Fit 6.5m Hepco Rail</translate> | |Step_Title=<translate>Fit 6.5m Hepco Rail</translate> | ||
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Fit new Hepco rail using 6mm capheads whilst extension piece is clamped onto frame (pic). |
+ | |||
+ | |||
+ | Each new Hepco rail will require pinning together, making sure the joints are as seamless as possible to allow gripper/pusher carriages to pass over freely. | ||
+ | |||
+ | |||
+ | Once rails are fitted to main frames, new holes can be marked/drilled/tapped 6mm (pic) on the extension pieces and secured. | ||
+ | |||
+ | <br /></translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_7.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_7.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Final Bracket Fix</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Now the last fixes between the angle and main frames can be drilled/tapped and secured.</translate> |
|Step_Picture_00=Flowline_6_to_6o5m_Extension_8.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_8.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Extend Cables and pipes</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>All Energy chain cable and pipes, as well as the energy chain itself, will need to be 500mm longer. |
− | |Step_Picture_00= | + | |
+ | |||
+ | If there's enough slack on current cables (and are in good condition), then extend and re-route. All other cables and air pipes will need replacing. | ||
+ | |||
+ | |||
+ | The energy chain itself will require extra links fitted (500mm). | ||
+ | |||
+ | |||
+ | Other cables that will need to be extended/or replaced: | ||
+ | |||
+ | Extraction power cable. | ||
+ | |||
+ | SX axis datum switch cable. | ||
+ | |||
+ | Outfeed beam cable. | ||
+ | |||
+ | <br /></translate> | ||
+ | |Step_Picture_00=Flowline_6_to_6o5m_Extension_16.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Re-fit X and SX axis Carriages</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Fit both X and SX carriages onto new Hepco rails and adjust eccentric journals to fit, then tighten. Once tightened, remove carriages, fit journal covers and then slide back on the Hepco rails. |
+ | |||
+ | |||
+ | Now connect all cable and air pipes to carriage, and make sure both limit blocks are fitted to either axis (pics)</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_10.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_10.jpg | ||
+ | |Step_Picture_01=Flowline_6_to_6o5m_Extension_11.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Moving Datum bracket</translate> |
− | |Step_Content=<translate> | + | |Step_Content=<translate>Bracket (pic) that's holding the SX axis datum switch will need to be moved 500mm towards the outfeed end and re-drilled-tapped 6mm.</translate> |
− | |||
− | |||
− | |||
− | |||
− | |||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_12.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_12.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Moving Rear guard mounting bracket</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Rear guard mounting bracket will then need moving 500mm towards outfeed end. |
+ | |||
+ | |||
+ | New holes will require drilling/tapping on the saw infeed side to accommodate the other end of the rear guarding when ready to fit.</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_13.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_13.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Fit extra Transfer support block</translate> |
− | |Step_Content=<translate> | + | |Step_Content=<translate>Fit extra support block towards outfeed end o X axis. Make sure its sitting completely flush with the top of the clacker housing trays (pic).</translate> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_17.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_17.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Re-fit Guarding</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Fit guarding, including all required extension pieces. |
+ | |||
+ | |||
+ | Re-fit Outfeed beam sensor and set up to reflector.</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_18.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_18.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Fit profile support plate</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Mark/drill and tap holes for rear profile support plate. |
+ | |||
+ | |||
+ | Make sure this sits just below multi outfeed level so profile transition is smooth. The support plate has slots if adjustment is required.</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_19.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_19.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Extend Extraction</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Extend extraction ducting and refit unit. Re-wire motor and test direction.</translate> |
|Step_Picture_00=Flowline_6_to_6o5m_Extension_20.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_20.jpg | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate></translate> | + | |Step_Title=<translate>Set up Parametres</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>Update 'InfeedLength' Param to 6500. Test both X and SX axis inputs on the io screen. |
+ | |||
+ | Test travel of 6.5m profile from multi all the way across to the saw. | ||
+ | |||
+ | |||
+ | Set 'datumtomat' parameter, then check /correct scaling and datum figures on both axis.</translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_21.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_21.jpg | ||
}} | }} | ||
Ligne 164 : | Ligne 191 : | ||
}} | }} | ||
{{Tuto Status | {{Tuto Status | ||
− | |Complete= | + | |Complete=Published |
}} | }} |
Procedure for increasing flowline capacity from 6 to 6.5m
Auteur Gareth Green | Dernière modification 30/03/2022 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pas encore d'image
Procedure for increasing flowline capacity from 6 to 6.5m
6.5m, Extension, Upgrade, 6.5
This procedure describes how to upgrade a flowline to increase the standard capacity from 6.0m to 6.5m.
The procedure involves extending the machining centre outfeed travel and saw infeed travel base to 6.0m to cope with a longer rail on each side. These are generally supplied as a new part.
Other ancillary parts that will need extending
Isolate power to extraction and then disconnect the cable from extraction motor. Remove floor bolt nuts from the extraction unit feet, and separate the ducting so that the unit can be moved.
Once moved, disconnect all guarding to the far end of multi outfeed and saw infeed (pictured).
Detach Outfeed beam sensor with the bracket so that the rear guarding support box section can be removed.
Remove both X and SX rear limit stops blocks, then disconnect all energy chain cables and air pipes at the carriage end.
Unclip the energy chain and remove both carriages from the axis.
On a bench, remove Gearbox/motor assembly's and replace the pinion gears (item 1), adding a small amount of Loctite on grubscrew when re-tightening.
Now remove all x6 journals and x6 covers from carriage and disregard.
Then Fit:
x3 Concentric Journals - These must be fitted on the TEETH SIDE of the Hepco rail.
x3 Eccentric Journals - Fit on the opposite side and LEAVE LOOSE for now.
Leave the x6 Journal covers off for now (item 2).
Detach both Hepco rails by removing the 6mm caphead bolts (pictured).
Once rails are removed, they can be separated into shorter lengths by knocking out the dowel pins towards the centre sections.
Clean and remove any dirt/grease/imperfections on the box section ready the the new rails.
If any of the tapped holes are compromised, re-tap 6mm.
Offer extension piece (box section) up to existing axis beam and clamp on using large G clamps and fixing angle **(*pic required) **
Mark holes in both pieces then drill/ tap 6mm.
Fit angle bracket to extension box sections using 6mm capheads....and locknuts where accessible for extra security (pic).
Do not fit to mainframe yet....only use G clamps until Hepco rail is attached.
Fit new Hepco rail using 6mm capheads whilst extension piece is clamped onto frame (pic).
Each new Hepco rail will require pinning together, making sure the joints are as seamless as possible to allow gripper/pusher carriages to pass over freely.
Once rails are fitted to main frames, new holes can be marked/drilled/tapped 6mm (pic) on the extension pieces and secured.
Now the last fixes between the angle and main frames can be drilled/tapped and secured.
All Energy chain cable and pipes, as well as the energy chain itself, will need to be 500mm longer.
If there's enough slack on current cables (and are in good condition), then extend and re-route. All other cables and air pipes will need replacing.
The energy chain itself will require extra links fitted (500mm).
Other cables that will need to be extended/or replaced:
Extraction power cable.
SX axis datum switch cable.
Outfeed beam cable.
Fit both X and SX carriages onto new Hepco rails and adjust eccentric journals to fit, then tighten. Once tightened, remove carriages, fit journal covers and then slide back on the Hepco rails.
Now connect all cable and air pipes to carriage, and make sure both limit blocks are fitted to either axis (pics)
Bracket (pic) that's holding the SX axis datum switch will need to be moved 500mm towards the outfeed end and re-drilled-tapped 6mm.
Rear guard mounting bracket will then need moving 500mm towards outfeed end.
New holes will require drilling/tapping on the saw infeed side to accommodate the other end of the rear guarding when ready to fit.
Fit extra support block towards outfeed end o X axis. Make sure its sitting completely flush with the top of the clacker housing trays (pic).
Fit guarding, including all required extension pieces.
Re-fit Outfeed beam sensor and set up to reflector.
Mark/drill and tap holes for rear profile support plate.
Make sure this sits just below multi outfeed level so profile transition is smooth. The support plate has slots if adjustment is required.
Extend extraction ducting and refit unit. Re-wire motor and test direction.
Update 'InfeedLength' Param to 6500. Test both X and SX axis inputs on the io screen.
Test travel of 6.5m profile from multi all the way across to the saw.
Set 'datumtomat' parameter, then check /correct scaling and datum figures on both axis.
en none 0 Published
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #