Flowline 6 to 6o5m Extension : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 37 : Ligne 37 :
  
  
On a bench, remove Gearbox/motor assembly's and replace the pinion gears (small amount of Loctite on grubscrew).  
+
On a bench, remove Gearbox/motor assembly's and replace the pinion gears (add a small amount of Loctite on grubscrew when re-tightening).  
  
  
Now remove all x6 journals and x6 covers and disregard. Now fit:
+
Now remove all x6 journals and x6 covers from carriage and disregard.  
 +
 
 +
Then Fit:
  
  
Ligne 48 : Ligne 50 :
  
  
Leave the Journal covers off for now.</translate>
+
Leave the x6 Journal covers off for now.</translate>
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_2.jpg
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_2.jpg
 
}}
 
}}
Ligne 69 : Ligne 71 :
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Drilling Extension Pieces</translate>
 
|Step_Title=<translate>Drilling Extension Pieces</translate>
|Step_Content=<translate></translate>
+
|Step_Content=<translate>Offer extension piece (box section) up to existing axis beam and clamp on using large G clamps and fixing angle **(*pic required) **
 +
 
 +
 
 +
Mark holes in both pieces then drill/ tap 6mm.</translate>
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_5.jpg
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_5.jpg
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
|Step_Title=<translate></translate>
+
|Step_Title=<translate>Fit Extensions</translate>
|Step_Content=<translate></translate>
+
|Step_Content=<translate>Fit extension box sections using 6mm capheads....and locknuts where accessible for extra security.</translate>
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_6.jpg
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_6.jpg
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
|Step_Title=<translate></translate>
+
|Step_Title=<translate>Fit 6.5m Hepco Rail</translate>
 
|Step_Content=<translate></translate>
 
|Step_Content=<translate></translate>
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_7.jpg
 
|Step_Picture_00=Flowline_6_to_6o5m_Extension_7.jpg

Version du 30 janvier 2022 à 18:05

Auteur avatarGareth Green | Dernière modification 30/03/2022 par Gareth Green en cours de rédaction

Introduction

This procedure describes how to upgrade a flowline to increase the standard capacity from 6.0m to 6.5m.

The procedure involves extending the machining centre outfeed travel and saw infeed travel base to 6.0m to cope with a longer rail on each side. These are generally supplied as a new part.

Other ancillary parts that will need extending

  • Cables
  • Energy Chains

Étape 1 - Remove Guarding/Extraction

Isolate power to extraction and then disconnect the cable from the motor. Remove floor bolt nuts from the extraction unit feet, and separate the ducting so that the unit can be moved.


Once moved, disconnect all guarding to the far end of multi outfeed and saw infeed (pictured).


Detach Outfeed beam sensor with the bracket so that the rear guarding support box section can be removed.



Étape 2 - Removing carriages and replacing Journals

Remove both X and SX rear limit stops blocks, then disconnect all energy chain cables and air pipes at the carriage end.

Unclip the energy chain and remove both carriages from the axis.


On a bench, remove Gearbox/motor assembly's and replace the pinion gears (add a small amount of Loctite on grubscrew when re-tightening).


Now remove all x6 journals and x6 covers from carriage and disregard.

Then Fit:


x3 Concentric Journals - These must be fitted on the TEETH SIDE of the Hepco rail.

x3 Eccentric Journals - Fit on the opposite side and LEAVE LOOSE for now.


Leave the x6 Journal covers off for now.



Étape 3 - Remove Hepco rails

Detach both Hepco rails by removing the 6mm caphead bolts (pictured).


Once rails are removed, they can be separated into shorter lengths by knocking out the dowel pins towards the centre sections.



Étape 4 - Prepare Hepco support base surface

Clean and remove any dirt/grease/imperfections on the box section ready the the new rails.


If any of the tapped holes are compromised, re-tap 6mm.



Étape 5 - Drilling Extension Pieces

Offer extension piece (box section) up to existing axis beam and clamp on using large G clamps and fixing angle **(*pic required) **


Mark holes in both pieces then drill/ tap 6mm.



Étape 6 - Fit Extensions

Fit extension box sections using 6mm capheads....and locknuts where accessible for extra security.



Étape 7 - Fit 6.5m Hepco Rail



Étape 8 -



Étape 9 -



Étape 10 -



Étape 11 -



Étape 12 -



Étape 13 -



Étape 14 -



Étape 15 -



Étape 16 -



Étape 17 -



Étape 18 -



Étape 19 -



Étape 20 -



Étape 21 -



Commentaires

Draft