[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 71 : | Ligne 71 : | ||
|Step_Content=<translate></translate> | |Step_Content=<translate></translate> | ||
|Step_Picture_00=Flowline_6_to_6o5m_Extension_5.jpg | |Step_Picture_00=Flowline_6_to_6o5m_Extension_5.jpg | ||
− | |||
− | |||
}} | }} | ||
{{Tuto Step | {{Tuto Step |
Procedure for increasing flowline capacity from 6 to 6.5m
Auteur Gareth Green | Dernière modification 30/03/2022 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pas encore d'image
Procedure for increasing flowline capacity from 6 to 6.5m
6.5m, Extension, Upgrade
This procedure describes how to upgrade a flowline to increase the standard capacity from 6.0m to 6.5m.
The procedure involves extending the machining centre outfeed travel and saw infeed travel base to 6.0m to cope with a longer rail on each side. These are generally supplied as a new part.
Other ancillary parts that will need extending
Isolate power to extraction motor and disconnect cable, remove floor bolt nuts from feet and separate ducting so that extraction unit can be moved.
Once moved, disconnect all guarding to the far end of multi outfeed and saw infeed (pictured).
Detach Outfeed beam sensor with bracket so that rear guarding support box section can be removed.
Remove both rear limit stops blocks, then disconnect all energy chain cables and air pipes at the carriage ends of the X and SX axis,
Unclip the energy chain and remove both carriages.
On a bench, remove Gearbox/motor assembly's and replace the pinion gears (small amount of Loctite on grubscrew).
Now remove all x6 journals and x6 covers and disregard. Now fit:
x3 Concentric Journals - These must be fitted on the TEETH SIDE of the Hepco rail.
x3 Eccentric Journals - Fit on the opposite side and LEAVE LOOSE for now.
Leave the Journal covers off for now.
Detach both Hepco rails by removing the 6mm caphead bolts (pictured).
Once rails are removed, they can be separated into shorter lengths by knocking out the dowel pins towards the centre sections.
Clean and remove any dirt/grease/imperfections on the box section ready the the new rails.
If any of the tapped holes are compromised, re-tap 6mm.
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #