| Ligne 39 : | Ligne 39 : | ||
|Step_Content=<translate><br /> | |Step_Content=<translate><br /> | ||
| − | * Use the aluminium setting jig with the gripper holes. | + | *Use the aluminium setting jig with the gripper holes. |
| − | * Clamp the jig with the clamps (manually, as air is not switched on yet) | + | *Clamp the jig with the clamps (manually, as air is not switched on yet) |
| − | * Move the frame and use the gripper as the guide to drop into the holes. | + | *Move the frame and use the gripper as the guide to drop into the holes. |
| − | * Use laser to align the frame in parallel with the backfence, taking care not to lose the gripper position relative to the gripper holes. | + | *Use laser to align the frame in parallel with the backfence, taking care not to lose the gripper position relative to the gripper holes. |
| − | {{Warning|...DO NOT USE THE GRIPPER ADJUSTMENT TO MOVE THE GRIPPER IN RELATION TO THE HOLES.}}<br /></translate> | + | {{Warning|...DO NOT USE THE GRIPPER ADJUSTMENT TO MOVE THE GRIPPER IN RELATION TO THE HOLES.}} |
| + | |||
| + | * With the outfeed beam in its fully extended position, there should be at least 5mm clearance from end of the beam to the MH Roller Bed Cross Brace<br /></translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
| − | |Step_Title=<translate> | + | |Step_Title=<translate>Position Extraction Unit</translate> |
| − | |Step_Content=<translate> | + | |Step_Content=<translate></translate> |
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
| − | |Step_Title=<translate> | + | |Step_Title=<translate>Square up and level Saw infeed</translate> |
| − | |Step_Content=<translate></translate> | + | |Step_Content=<translate>* Measure up diagonals to get the two transfer frames fully parallel. |
| + | * Measure the gap between the frames, ensuring the male posts on the stub arms (on frames) are same distance as the hole centres on the transfer beams. | ||
| + | * Level the frame. | ||
| + | * Position Transfer Arms 1 and 9 to fine tune the frame positions. | ||
| + | * Place a level on these two transfer arms. | ||
| + | * Level the frame again using the two transfer arms to indicate if the Saw Infeed frame needs to be raised or lowered. | ||
| + | * Recheck level and squareness of Saw Infeed.</translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
| − | |Step_Title=<translate>Position transfer arms</translate> | + | |Step_Title=<translate>Position remaining transfer arms</translate> |
|Step_Content=<translate></translate> | |Step_Content=<translate></translate> | ||
}} | }} | ||
Correct procedure for ZX5 Installation
Auteur
Gareth Green | Dernière modification 19/08/2025 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pas encore d'image
Correct procedure for ZX5 Installation
ZX5, Install
No hard pipe under the Saw.