R0015346 Conveyor blower system : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
 
(2 révisions intermédiaires par le même utilisateur non affichées)
Ligne 9 : Ligne 9 :
 
}}
 
}}
 
{{Introduction
 
{{Introduction
|Introduction=<translate>'''<u>Tools Required</u>'''
+
|Introduction=<translate>10/09/2025
  
  
Standard hex key set
+
Moved to Confluance
  
Pipe cutters
 
  
Pipe identification numbers
+
Click [https://stuga-ltd.atlassian.net/wiki/external/YzRhMjQ5YTQ5OTRiNDU0Njg0YjAwYmYzMzBkNTUxYjc Here]
 
 
 
 
'''<u>Parts Required</u>'''
 
 
 
 
 
P0000046 Fitting: 'Y' Adaptor 6mm x 1
 
 
 
P0000053 6mm T (P16) x 1
 
 
 
P0000160 Fitting: Flow Controller In Line 6mm x 1
 
  
 
<br /></translate>
 
<br /></translate>
Ligne 33 : Ligne 22 :
 
{{EPI}}
 
{{EPI}}
 
{{Tuto Step
 
{{Tuto Step
|Step_Title=<translate>Unless otherwise stated</translate>
+
|Step_Title=<translate></translate>
|Step_Content=<translate>Use Loctite 243 on all fasteners
+
|Step_Content=<translate></translate>
 
 
Use Loctite 572 on all threaded pneumatic connection
 
 
 
Pen mark all fasteners to show finalised</translate>
 
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Connect Drive roller blower</translate>
 
|Step_Content=<translate>use  6 x 4 mm black air pipe .
 
 
 
 
 
Use identifications of 2139
 
 
 
 
 
Connect blower elbow to in line flow regulator
 
 
 
 
 
Connect flow regulator to 6mm Y connector
 
 
 
'''<u>Correct photo required please</u>'''</translate>
 
|Step_Picture_00=R0015346_Conveyor_blower_system_Screenshot_2023-10-31_151142.png
 
|Step_Picture_01=R0015346_Conveyor_blower_system_Screenshot_2023-11-16_143222.png
 
|Step_Picture_01_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":856,"height":645,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.7,"scaleY":0.7,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/8/80/R0015346_Conveyor_blower_system_Screenshot_2023-11-16_143222.png","filters":[]},{"type":"wfellipse","version":"2.4.6","originX":"center","originY":"center","left":409.44,"top":226.56,"width":59.28,"height":59.28,"fill":"rgba(255,0,0,0)","stroke":"#FF0000","strokeWidth":2,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"rx":29.63895683249864,"ry":29.63895683249864},{"type":"wfarrow2line","version":"2.4.6","originX":"center","originY":"center","left":357,"top":154,"width":82,"height":84,"fill":"rgba(255,0,0,0)","stroke":"#FF0000","strokeWidth":4,"strokeDashArray":null,"strokeLineCap":"round","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"x1":-41,"x2":41,"y1":-42,"y2":42,"x2a":32.753859151278576,"y2a":22.100222084077224,"x2b":21.304671857186023,"y2b":33.276809680691386},{"type":"wfarrow2circle","version":"2.4.6","originX":"center","originY":"center","left":316,"top":112,"width":16,"height":16,"fill":"#aaa","stroke":"#666","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":0.5,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":8,"startAngle":0,"endAngle":6.283185307179586},{"type":"wfarrow2circle","version":"2.4.6","originX":"center","originY":"center","left":398,"top":196,"width":16,"height":16,"fill":"#aaa","stroke":"#666","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":0.5,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":8,"startAngle":0,"endAngle":6.283185307179586},{"type":"textbox","version":"2.4.6","originX":"center","originY":"center","left":337.61,"top":57.84,"width":193.43,"height":48.82,"fill":"#FF0000","stroke":"#FF0000","strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1.56,"scaleY":1.56,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"This is wrong. Should face other way ","fontSize":20,"fontWeight":"normal","fontFamily":"sans-serif","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"minWidth":20,"styles":{} }],"height":452,"width":600}
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>6mm Y connector</translate>
 
|Step_Content=<translate>6x4mm black air pipe .
 
 
 
 
 
From 6mm Y connector
 
 
 
 
 
1 pipe to run to saw connection . Leave trailing pipe 2 meters long with identification
 
 
 
 
 
1 pipe to run along indicated side of conveyor to feed top blowers
 
 
 
'''<u>Correct photo required please</u>'''</translate>
 
|Step_Picture_00=R0015346_Conveyor_blower_system_Screenshot_2023-10-31_150804.png
 
|Step_Picture_00_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":1565,"height":804,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.38,"scaleY":0.38,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/5/59/R0015346_Conveyor_blower_system_Screenshot_2023-10-31_150804.png","filters":[]},{"type":"wfarrow2line","version":"2.4.6","originX":"center","originY":"center","left":346,"top":176.5,"width":22,"height":83,"fill":"rgba(255,0,0,0)","stroke":"#FF0000","strokeWidth":4,"strokeDashArray":null,"strokeLineCap":"round","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"x1":11,"x2":-11,"y1":41.5,"y2":-41.5,"x2a":-13.60871059108781,"y2a":-20.11788997661956,"x2b":1.8572164846470631,"y2b":-24.217292334043258},{"type":"wfarrow2circle","version":"2.4.6","originX":"center","originY":"center","left":357,"top":218,"width":16,"height":16,"fill":"#aaa","stroke":"#666","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":0.5,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":8,"startAngle":0,"endAngle":6.283185307179586},{"type":"wfarrow2circle","version":"2.4.6","originX":"center","originY":"center","left":335,"top":135,"width":16,"height":16,"fill":"#aaa","stroke":"#666","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":0.5,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":8,"startAngle":0,"endAngle":6.283185307179586}],"height":308,"width":600}
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>6mm Tee connection</translate>
 
|Step_Content=<translate>Split feed pipe with 6mm Tee connector at upper bracket position
 
 
 
 
 
fit inline flow regulator before 6mm tee connector
 
 
 
 
 
run one feed pipe direct to blower
 
 
 
'''<u>Correct photo required please</u>'''</translate>
 
|Step_Picture_00=R0015346_Conveyor_blower_system_Screenshot_2023-10-31_151508.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Last blower feed</translate>
 
|Step_Content=<translate>attach tie bases to top mount bracket
 
 
 
 
 
provide details to raise ecr to include drilling details
 
 
 
 
 
attach feed pipe to tie bases and feed last blower elbow
 
 
 
'''<u>Correct photo required please</u>'''</translate>
 
|Step_Picture_00=R0015346_Conveyor_blower_system_Screenshot_2023-10-31_151638.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Pneumatics test</translate>
 
|Step_Content=<translate>Connect air feed to trailing 6mm pipe
 
 
 
 
 
Check all flow regulators are installed in the correct orientation
 
 
 
 
 
When flow regulators are fully closed, air should be stopped .
 
 
 
 
 
If air can only be regulated to a small flow, regulator is installed in the wrong orientation</translate>
 
|Step_Picture_00=R0000711_Rotary_Base_Assembly_quality-assurance-testing.png
 
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}

Version actuelle datée du 10 septembre 2025 à 16:48

Auteur avatarGareth Green | Dernière modification 10/09/2025 par Gareth Green en cours de rédaction

Blower system pipework installation

Difficulté
Moyen
Durée
1 heure(s)

Introduction

10/09/2025


Moved to Confluance


Click Here


Étape 1 -

Commentaires

Draft