Ligne 39 : | Ligne 39 : | ||
|Step_Content=<translate><br /> | |Step_Content=<translate><br /> | ||
− | * Use the aluminium setting jig with the gripper holes. | + | *Use the aluminium setting jig with the gripper holes. |
− | * Clamp the jig with the clamps (manually, as air is not switched on yet) | + | *Clamp the jig with the clamps (manually, as air is not switched on yet) |
− | * Move the frame and use the gripper as the guide to drop into the holes. | + | *Move the frame and use the gripper as the guide to drop into the holes. |
− | * Use laser to align the frame in parallel with the backfence, taking care not to lose the gripper position relative to the gripper holes. | + | *Use laser to align the frame in parallel with the backfence, taking care not to lose the gripper position relative to the gripper holes. |
− | {{Warning|...DO NOT USE THE GRIPPER ADJUSTMENT TO MOVE THE GRIPPER IN RELATION TO THE HOLES.}}<br /></translate> | + | {{Warning|...DO NOT USE THE GRIPPER ADJUSTMENT TO MOVE THE GRIPPER IN RELATION TO THE HOLES.}} |
+ | |||
+ | *With the outfeed beam in its fully extended position, and the gripper at the end of travel, there gripper should not be able to clash with the infeed top clamp. This should leave the end of the beam 40-60mm from the MH Cross Bar<br /></translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate> | + | |Step_Title=<translate>Position Extraction Unit</translate> |
− | |Step_Content=<translate> | + | |Step_Content=<translate></translate> |
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate> | + | |Step_Title=<translate>Square up and level Saw infeed</translate> |
− | |Step_Content=<translate></translate> | + | |Step_Content=<translate>* Measure up diagonals to get the two transfer frames fully parallel. |
+ | * Measure the gap between the frames, ensuring the male posts on the stub arms (on frames) are same distance as the hole centres on the transfer beams. | ||
+ | * Level the frame. | ||
+ | * Position Transfer Arms 1 and 9 to fine tune the frame positions. | ||
+ | * Place a level on these two transfer arms. | ||
+ | * Level the frame again using the two transfer arms to indicate if the Saw Infeed frame needs to be raised or lowered. | ||
+ | * Recheck level and squareness of Saw Infeed.</translate> | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
− | |Step_Title=<translate>Position transfer arms</translate> | + | |Step_Title=<translate>Position remaining transfer arms</translate> |
|Step_Content=<translate></translate> | |Step_Content=<translate></translate> | ||
}} | }} |
Correct procedure for ZX5 Installation
Auteur Gareth Green | Dernière modification 25/10/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pas encore d'image
Correct procedure for ZX5 Installation
ZX5, Install
No hard pipe under the Saw.