R0015336 Pneumatic Output Testing

Auteur avatarGareth Green | Dernière modification 2/04/2024 par Gareth Green en cours de rédaction

Details for manual pneumatic output testing on module

Introduction

Tools Required


PCL airline connection

12mm blanking ports

Valve Manual over ride tool

Standard screwdriver set


Parts required


R0015040 completed module

Étape 1 - Safety

Output testing will require valve operation with no e/s circuit


Ensure the following


Work area is clear from all components not required for testing


All colleagues are aware of the procedure being undertaken


No additional colleagues are working on the module


PCL coupling is accessible to release pressure in case of emergency


Testing procedure is fully adhered to



Étape 2 - Set Air service unit soft start

Wind fully out soft start screw situated on top on main air service unit



Étape 3 - Check all open ports

Ensure all open ports and trailing pipes are suitably blanked



Étape 4 - Connect main PCL

Connect main pcl air feed to air service unit


Increase Air service unit pressure to 6.0bar /6mpa



Étape 5 - Check for leaks

Check for audible leaks on the red pipe lines installed and correct if found


Check air gun regulator functions properly . Fully open the regulator (2 bar limited ) and test air gun assembly



Commentaires

Draft