R0015285 Bench Assemble Pneumatic Rail : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 76 : Ligne 76 :
 
Pen mark all bolts to show finalised</translate>
 
Pen mark all bolts to show finalised</translate>
 
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png
 
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Handing</translate>
 +
|Step_Content=<translate>If Machine is R to L build rail as shown
 +
 +
 +
If machine is L to R build rail mirrored to layout shown</translate>
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
Ligne 148 : Ligne 155 :
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Mount assembled components</translate>
 
|Step_Title=<translate>Mount assembled components</translate>
|Step_Content=<translate>Mount assembled components onto mounting bar D0016300 as shown  
+
|Step_Content=<translate>Mount assembled components onto mounting bar D0016300 as shown
 +
 
 +
Space as follows 
 +
 
 +
Position 1st ethercat box 100mm for end of maytec beam ( non slotted hole end )
 +
 
 +
All mounted components to be spaced 100mm apart
 +
 
 +
Except for
 +
 
 +
Ethercat boxes to butt together
  
 +
Valve to valve bank 1 , set to 70mm
  
(dimensions required please )
+
Valve B1 and Valve B2 spaced at  130mm
  
  
Ligne 160 : Ligne 178 :
  
  
Valve 1 and 2 secured with M4 x 40 socket caps and A form washers  
+
Valve 1 and 2 secured with M4 x 40 socket caps and A form washers, spaced away from maytec rail with 2 M8 washers to enable valve to sit straight 
  
  
Ethercats Mounted with M6 x 16 socket caps and A form washers
+
Ethercats Mounted with M6 x 16 socket caps and A form washers.
  
  
Valve mounted with M3 pan heads
+
Valve mounted with M4 x 30  socket caps, and M4 D nuts. ( one d nut will require cutting to shorten to allow fitment )
  
  

Version du 5 septembre 2023 à 09:37

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard spanner set

Standard hex key set

Pipe cutters

Standard screwdriver set


Parts Required


D0016300 x 1

P0001074 x 8

P0001101 x 2

P0001102 x 2

P0001071 x 1

P0001186 x 10

P0001068 x 1

P0000470 x 1

P0001040 x 2

P0000010 x 6

P00000007 x 2

P0000142 x 1

P0001008 x 2

D0010167 x 2

C0001018 x 2

P0001022 x 2

P0001009 x 2

P0001108 x 3

P0001166 x 1

P0001106 x 1


Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connections

Pen mark all bolts to show finalised



Étape 2 - Handing

If Machine is R to L build rail as shown


If machine is L to R build rail mirrored to layout shown

Étape 3 - Assemble valve bank 1

Assembly valve bank as shown using


P0001074 x 4

P0001101 x 1

P0001102 x 1

P0001071 x 1

P0001186 x 8



Étape 4 - Assemble valve bank 2

Assembly valve bank as shown using


P0001074 x 4

P0001101 x 1

P0001102 x 1

P0001068 x 1

P0001186 x 2


Étape 5 - Assemble valve

Assemble fittings onto valve P0000470 using


P0001040 x 2

P0000010 x 2

p0000007 x 2

P0000142 x 1



Étape 6 - Assemble regulators

Assemble 2 off P0001008 regulators with fittings as listed


P0000010 x 4


Étape 7 - Assemble Ethercat boxes

Mount 2 off C0001018 Ethercat boxes to mounting plates D0010167 2 off using M3 x 20 Pan head fasteners



Étape 8 - Mount assembled components

Mount assembled components onto mounting bar D0016300 as shown

Space as follows

Position 1st ethercat box 100mm for end of maytec beam ( non slotted hole end )

All mounted components to be spaced 100mm apart

Except for

Ethercat boxes to butt together

Valve to valve bank 1 , set to 70mm

Valve B1 and Valve B2 spaced at 130mm


Use following fixings


Each regulator mounted with P0001022 bracket and P0001009 nut, fastened with M5 x 12 socket caps and washers


Valve 1 and 2 secured with M4 x 40 socket caps and A form washers, spaced away from maytec rail with 2 M8 washers to enable valve to sit straight


Ethercats Mounted with M6 x 16 socket caps and A form washers.


Valve mounted with M4 x 30 socket caps, and M4 D nuts. ( one d nut will require cutting to shorten to allow fitment )


Use D nuts to provide fixing points into rail



Étape 9 - Connect Air feed pipes

Connect 12mm and 8mm blue air lines as shown


Use fittings


P0001108 x 3

P0001166 x 1

p0001106 x 1



Commentaires

Draft