R0015084 Bench assemble and Drill Off Swarf chutes

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard HSS drill set

Standard tap set

Standard spanner set


Parts Required

D0002973 Swarf chute front section OH (D7908) x 1

D0008702 Swarf Chute Front Section Small OH (D7905) x 1

H0007907 Swarf dispersal lip x 1

H0007909 Swarf corner left x 1

H0007910 Swarf corner right x 1

H0007946 Front swarf chute infill x 1

P0000047 Bulkhead Elbow 6mm x 2

P0000152 Bulkhead Elbow 8mm x 2

P0000161 Plug-in Reducer 6mm Tube 8mm Fitting x 2

P0000489 Air Nozzle Flat(Air Knife) x 2

P0000540 Straight Adaptor Ø8mm x 1/4'' BSP Female x 2

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - ECR raised

Ecr raised to cover current reworks to panel


Until processed rework at production

Étape 3 - Assemble chutes

Assemble chute panels as shown



Étape 4 - Position swarf corners

Position swarf corners onto main frame



Étape 5 - Position assembled chute

Position assembled chute into frame



Étape 6 - Adjust chutes and corners

Adjust panels to best fit



Étape 7 - Drill off to suit

Drill to suit all fixing holes @ M5


8 off in total



Étape 8 - Mark lower chute position

With chutes still fitted, align and mark lower lip cute


Align with bottom of lifting channel and central between fitted chutes


Étape 9 - Remove all chutes

Remove all chutes and drill marked fixing points for lower lip chute


Drill 2 off M5



Étape 10 - Assemble chutes

Fit blowers to chutes and add connecting 8mm black pipe. Fix with M4 tie base and tiewrap


Add 2 off 6mm bulkheads and tie base for clamp feeds


Add grommit for clamp reed switch



Étape 11 - Label bulkheads both sides of panel

Label 6mm bulkheads both sides of panel as


3501 and 3502



Commentaires

Draft