R0000571 Fit and Level Cut Tables , Finalise Eject

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


1 meter straight edge

500mm rule

Standard hex key

Standard spanner set

Feeler gauges

Engineers level

Adjustment shim


Parts Required

A0001069 Energy Chain Series B15.050 (48mm radius) Openable x 0.5

A0001070 Igus Mounting Br Set for A0001069 Non-Pivot x 1

A0001074 igus mounting bracket set x 1

D0004551 Cylinder Spacer x 1

D0004553 Cover Fixing Bar x 1

D0004554 Bar Spacer Short x 1

D0004555 Bar Spacer Long x 1

D0004769 Ejector Clamp Pad to be made in conjuction with D5121 (5305) x 1

D0004770 Infeed Clamp Pad to be made in conjunction with D5122 (5299) x 1

D0005121 Ejector Clamp Stainless Pads (5306) x 1

D0005122 Infeed Clamp Pad (5300)x 1

D0005199 Ejector Cover x 1

D0005412 Energy Chain Adapter Plate x 1

H0004556 Fixing Bar Gap Cover (5297) x 1

H0004656 Material Trip Stripx 1

P0000368 Extension 1/8 bsp x 22 long x 1

P0000443 Cleanline Cylinder 32 x 450 PN11246 x 1

P0000444 Reed Switch: Pneumax 1580U (5.0m Lead) x 2

P0001198 flow controller 6mm elbow 1/8 x 2

Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Level Infeed pad

Attach Infeed pad


Use engineers level to check level


Add shim if required to adjust



Étape 3 - Attach Outfeed Pad

Attach Eject pad using m6 ? socket caps


Do not apply adhesive, do not apply final tension



Étape 4 - Set flatness

Use infeed pad as datum


Use 1 meter straight edge and feeler gauges


Adjust eject table to suit infeed pad



Étape 5 - Set front alignment

Set front alignment using adjustment in counter bores in pads


Use 1 meter straight edge and feeler gauges to set



Étape 6 - Check parallel

Use Steel rule to measure from pads to rear fence mount on frame from both tables


This measurement needs to be the same


Use adjustment in pads, and pillar supports to correct


Ensure front alignment of tables is held when adjusting

Étape 7 - Finalise fasteners

Finalise all fasteners with 243 and correct tension once adjustments are complete

Étape 8 - Fit eject cylinder

fit eject cylinder with spacer


Ensure alignment


Ensure correct position of cylinder thread adjustment




Étape 9 - Fit Cylinder fittings

fit flow regs with one off extension



Étape 10 - Fit energy chain

Fit energy chain with backing plate.


Ensure pivoting bracket is fitted to correct end



Étape 11 - Fit cover fixing bar

Fit cover fixing bar with 2 off spacers and M8 sockets


Tap holes to clean m5 threads



Étape 12 - Fit gap covers

Fit 2 off gap covers with m5 socket caps


do not finalise position S



Étape 13 - Fit ejector cover



Étape 14 - Set flatness

Use infeed pad as datum


Use 1 meter straight edge and feeler gauges


Adjust eject table to suit infeed pad



Étape 15 - Set front alignment

Set front alignment using adjustment in counter bores in pads


Use 1 meter straight edge and feeler gauges to set



Étape 16 - Check parallel

Use Steel rule to measure from pads to rear fence mount on frame from both tables


This measurement needs to be the same


Use adjustment in pads, and pillar supports to correct


Ensure front alignment of tables is held when adjusting

Étape 17 - Finalise fasteners

Finalise all fasteners with 243 and correct tension once adjustments are complete

Étape 18 - Fit eject cylinder

fit eject cylinder with spacer


Ensure alignment


Ensure correct position of cylinder thread adjustment




Étape 19 - Fit Cylinder fittings

fit flow regs with one off extension



Étape 20 - Fit energy chain

Fit energy chain with backing plate.


Ensure pivoting bracket is fitted to correct end



Étape 21 - Fit cover fixing bar

Fit cover fixing bar with 2 off spacers and M8 sockets


Tap holes to clean m5 threads



Étape 22 - Fit gap covers

Fit 2 off gap covers with m5 socket caps


do not finalise position S



Étape 23 - Fit ejector cover



Commentaires

Draft