R0015311 Install and Align Datum rollers

Auteur avatarGareth Green | Dernière modification 28/03/2024 par Gareth Green en cours de rédaction

Fitting and alignment details

Introduction

Tools required


Standard hex key set

2 meter straight edge

1 meter straight edge

12" engineers level

12" inch engineers square

Feeler gauge set


Parts Required


R0015297 Mount V Notch Datum rollers

Étape 1 - Unless otherwise stated

Use locktite 243 on all fasteners

Use loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Level Infeed datum rollers

1 Level On X axis using engineers level and adjusting grubscrews in indicated areas


2 Level from Rollers at indicated point. Adjust previous level points evenly to adjust level reading on rollers


3 Remove Middle roller and top blower


4 Use 300mm parallels to span rollers and engineers level to check and adjust Y axis level of rollers

Étape 3 - Level V notch datum rollers

Commentaires

Draft