R0015310 Install V Notch Subframe

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Installation criteria for V notch sub frame

Difficulté
Difficile
Durée
6 heure(s)

Introduction

Tools Required


Standard hex key set

Standard Spanner set

Parallel setting blocks

600mm rule

1 meter straight edge

2 meter straight edge

12 " engineers level

12" engineers square


Parts Required


D0015151 Shaft End Washer x 8

D0015155 Vertical Spacer Bar x 4

R0015035 Bench Assemble V Notch Components

Étape 1 - Unless otherwise stated

Use locktite 243 on all fasteners

Use loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 -

Commentaires

Draft