R0015324 Install pipe and cable looms

Auteur avatarGareth Green | Dernière modification 13/11/2023 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

6mm black Air pipe

Pipe identification numbers

Pneumatic Pipe cutters


W0001002 cable (from consumable stock )


Parts Required


M0001127 Cable Tie Base (m6) (from consumable stock)

P0000046 Fitting: 'Y' Adaptor 6mm x 2


Étape 1 - Unless otherwise stated

Use loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connections

Pen mark all bolts to show finalised



Étape 2 - Attach tie bases to frame

Attach 7 off M0001127 Cable Tie Base (m6) as shown using M5 x 10 button sockets



Étape 3 - Connect Safety gate cylinder feeds

Identification numbers


951

959


1 Cut 2 6mm black air pipes long enough to run the indicated route


2 Identify each pipe, one 951 and one 959


3 Connect pipes to gate as indicated and leave pipes to loom later


Étape 4 - Cut Siren cable

Cut Length of W00010002 cable to follow the route shown , and mark both ends clearly Y94



Étape 5 - Create loom

Start to create loom from safety gate


Attach to first tiebase and separate pneumatic cables to top lug and cables to lower


Pipes 951 and 959, Y94 cable, and reed switches X189 and X190 should be loomed in as shown


Y94 should be left with enough length to connect to cut guard beacon when fitted



Étape 6 - continue loom

Continue fixing loom until

Commentaires

Draft