Correct alignment protocol for subframe alignment
Auteur Gareth Green | Dernière modification 12/03/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Correct alignment protocol for subframe alignment
R0002913E_Install_and_Align_Rotary_head_Subframe_Screenshot_2023-07-27_113910.png
Tools Required
300mm engineers level
2 meter straight edge
1 meter straight edge
Standard hex key set
Standard spanner set
Z support jigs
Parts Required
D0000095 Bottom Plate x 2
D0006484 Front Tiebeam x 1
D0006485 Rear Tiebeam x 1
D0007681 Shaft Adjust Plate x 2
D0007683 Lower Beam Mount x 1
D0007684 Lower Beam Mount - Mirror x 1
D0007695 Platform (D8714) x 1
D0007787 Upper Beam Mount x 1
D0007835 Hard Stop x 2
D0008087 Z Servo Housing x 2
H0006025 Shaft 40mm: 939mm Flowline Y-axis x 2
H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2
R0015296 Bench Assemble bearings AssembliesUse loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all bolts to show finalised
Subframe now requires dowelling in position
1 Drill upper beam mount with 10mm HSS 2 off , hole depth should be 20mm minimum into steel mounting tab . Use 10mm x 60mm spiral pin to fix
2 Dowel lower beam mounts . 4 off Drill indicated holes to 9.5 mm , then use 10mm hand reamer to finish . Fix with 10mm x 50 mm hardened dowel
use
D0006484 Front Tiebeam x 1
D0006485 Rear Tiebeam x 1
1 Fit 4 off 8mm x 24 mm hardened dowels to each tie bar as shown
2 Align D0006485 Rear Tie beam with bearing blocks and use 8 off M8 x 50 socket caps to fix. Use fasteners to evenly pull faces together , alternate between top and bottom fasteners to pull faces together parallel
3 Align D0006484 Rear Tie beam with bearing blocks and use 8 off M8 x 50 socket caps to fix. Use fasteners to evenly pull faces together , alternate between top and bottom fasteners to pull faces together parallel
Lift fitted tie bars up and insert 1 off per bar support jig as shown .
Secure with 2 off large tie wrap per jig
Slide 2 off H0006025 Shaft 40mm: 939mm Flowline Y-axis into the position shown.
Ensure dimple position on shaft is marked clearly on end shaft as shon
Fit 4 off bearing blocks from assembly R0015296 Bench Assemble bearings Assemblies
Orientate as shown .
Slide Y axis shafts into final position
1 Align dimples using shaft end mark .
Top shaft is at 45 degrees
Bottom shaft is at 180 degrees
See image for grubscrew sizes
Individually remove each M8 socket cap (16 off) that secure the tie bars , apply adhesive and apply final tension