R0002913E Install and Align Rotary head Subframe

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


300mm engineers level

2 meter straight edge

1 meter straight edge

Standard hex key set

Standard spanner set


Parts Required


D0000095 Bottom Plate x 2

D0006484 Front Tiebeam x 1

D0006485 Rear Tiebeam x 1

D0007681 Shaft Adjust Plate x 2

D0007683 Lower Beam Mount x 1

D0007684 Lower Beam Mount - Mirror x 1

D0007695 Platform (D8714) x 1

D0007787 Upper Beam Mount x 1

D0007835 Hard Stop x 2

D0008087 Z Servo Housing x 2

H0006025 Shaft 40mm: 939mm Flowline Y-axis x 2

H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2

R0015296 Bench Assemble bearings Assemblies


Étape 1 - Unless otherwise stated

Use loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connections

Pen mark all bolts to show finalised



Étape 2 - Level Frame

1 Use engineers level to level frame at the indicated points . Any discrepancy between the two faces should be adjusted to be even both sides .


2 Use 2 meter straight edge and 300mm engineers level to level Y axis of machine at the indicated points

Étape 3 - Instal Upper beam mount

Mount and orientate D0007787 Upper Beam Mount x 1 as shown


Fix with M12 x 70 socket caps and A form washers , do not apply adhesive


Add 8 off M10 x 30 flat bottomed grubscrews


Étape 4 - Level upper beam mount

1 Level X axis on both sides of the beam at the indicated point using M10 grubscrews to adjust


2 Adjust Y Axis using grubscrews . only adjust one end up, as height needs to remain as close as possible to frame monting point.


Use 1 meter straight edge and engineers level


3 Check and adjust flatness by using 1 meter straight edge to gauge. Bias can be used on jacking grubscrews to manipulate the upper beam mount flat.


...Beam should be set level and flat under tension from M12 x 70 socket caps Upper beam mount should remain as close as possible to frame mounting points


Étape 5 - Install Z axis shafts

1 Mount H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2

and suspend in place with M16 x 45 hex head bolts and D0007681 Shaft Adjust Plate x 2

Add 2 off large black tie wraps per side as shown

2 Fit 2 off bearing block from R0015296 Bench Assemble bearings Assemblies to z shafts orientated as shown.

M6 holes should face centre of machine and M8 holes and 8mm dowel holes should face front of machine

Étape 6 - Assemble centre platform

1 Prepare 6mm dowel holes indicated with 6mm reamer in D0007695 Platform


2 Lightly attach as shown 2 off D0008087 Z Servo Housing using 4 off M8 x 40 socket caps and A form washers per block

3 Fit 4 off 6mm x 30 dowel to align blocks

4 Finalise M8 socket caps

5 Check with 40mm shaft jig that alignment is correct and shaft can pass through assembled 40mm bore


Étape 7 - Fit Centre platform

1 Ensure2 off dimples on each main vertical shaft are facing the rear of the machine

2 Slide into position centre platform assembly ensuring the correct orientation is achieved in regards to Machined pockets on the centre platform


3 Align dimples to M8 tapped holes in crossmember and fix with 4 off M8 x 16 kcp grubscrew


4 Fit 2 off bearing block from R0015296 Bench Assemble bearings Assemblies as shown. Blocks should be orientated as previous fitted upper blocks

Étape 8 - Fit lower beam mounts

Fit

D0007683 Lower Beam Mount x 1

D0007684 Lower Beam Mount - Mirror x 1 as shown


1 Use M10 x 70 socket caps , A form washers and standard M10 nuts to fix as shown

2 Insert 4 off M10 x 30 flat bottomed jacking grubscrew as shown


Étape 9 - Level lower beam mounts

1 Apply Medium tension to M10 socket caps and wind down M10 jacking grubscrews to touch on frame


2 Level X axis of block using pair A or B, never use all 4


3 Level Y axis of block using pair A or B, never use all 4


Repeat for other side


4 Level across beam mounts using 2 meter straight edge. Adjust lowest platform to correct any error . Always use all 4 jacking grubscrews turned exactly the same amount to raise platform to adjust


5 Once levelled, check no gaps are present on contact face of straightedge along both lower beam mounts

Étape 10 - Align lower beam mounts

1 Insert 1 off M8 x 16 kcp grubscrew per lower beam mount and apply light pressure with no adhesive


2 Release pressure on M10 socket caps that hold lower beam mounts in place


3 Use straight edge as indicated

...Only Apply light pressure to G clamps shown to hold straight edge. Heavy pressure will damage straight edge

4 Adjust lower beam mount position using level as indicated . Once level is achieved, apply light pressure to M10 socket caps and repeat for other side

5 Adjust Lower beam mount position using a level as indicated . Repeat on other side

Étape 11 - Check shaft pitching

1 Use Z shaft slip gauge to measure pitch of shafts at upper point shown . Measure gap using feeler gauges


2 Check shaft pitching at lower point shown , this must be set to replicate upper measurement . Adjust lower beam mounts to adjust this measurement


...Adjustment for lower shaft pitching will change previous set level on Z servo housing. The level must be equalised between the two blocks when adjusting the shaft pitch


Étape 12 - Attach bottom plate

Attach 2 off D0000095 bottom plate as shown


1 Use 2 off M8 x 30 socket caps with A form washers to fix each plate .


2 Use M8 x 70 Set bolt with standard M8 nut and A form washer in central hole


3 Tension M8 nut only when level is on top of plate above so no movement occurs

Étape 13 - Quality check

Check the following points

1 Level Check

2 Level check

3 Level check

4 Level check

5 Alignment and Level check

6 Alignment check

Étape 14 - Quality check

Check the following


1 Z shaft M16 set bolts are glued and finalised

2 4 off Grubscrews are finalised

3 2 off grubscrews are finalised

4 M10 socket caps are finalised

Étape 15 - continue to part 2 of dokit

R0002913E Install and Align Rotary head Subframe PART 2

Commentaires

Draft