R0002913E Install and Align Rotary head Subframe

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Correct alignment protocol for subframe alignment

Difficulté
Très difficile
Durée
4 heure(s)

Introduction

Tools Required


300mm engineers level

2 meter straight edge

1 meter straight edge

Standard hex key set

Standard spanner set


Parts Required


D0000095 Bottom Plate x 2

D0006484 Front Tiebeam x 1

D0006485 Rear Tiebeam x 1

D0007681 Shaft Adjust Plate x 2

D0007683 Lower Beam Mount x 1

D0007684 Lower Beam Mount - Mirror x 1

D0007695 Platform (D8714) x 1

D0007787 Upper Beam Mount x 1

D0007835 Hard Stop x 2

D0008087 Z Servo Housing x 2

H0006025 Shaft 40mm: 939mm Flowline Y-axis x 2

H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2

R0015296 Bench Assemble bearings Assemblies


Étape 1 - Unless otherwise stated

Use loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connections

Pen mark all bolts to show finalised



Étape 2 - Level Frame

1 Use engineers level to level frame at the indicated points . Any discrepancy between the two faces should be adjusted to be even both sides .


2 Use 2 meter straight edge and 300mm engineers level to level Y axis of machine at the indicated points

Étape 3 - Instal top

Commentaires

Draft