R0000706 Bench assemble Infeed Datum rollers

Auteur avatarGareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction

Introduction

Tools required


External circlip pliers

Standard hex key set

Pipe cutters

Pneumatic identification numbers


Parts Required


B0000062 Circlip 20mm External x 6

D0001176 Washer : bearing shim x 3

D0001333 Roller Ø40 x 80 c/w bearing x 3

D0001334 Roller Ø40 x 102 c/w bearing x 3

D0003108 Shaft 20mm: 146mm Clamp Roller Shaft x 3

D0007677 Infeed Base Rail (D2972) x 1

D0007942 Shaft 20mm: 119.4mm ZX Datum Roller Circlip x 3

D0010896 Infeed Clamp Blower Vert x 1

D0010897 Infeed Clamp Blower x 1

P0000053 6mm T (P16) x 1

P0000160 Fitting: Flow Controller In Line 6mm x 1

Étape 1 - Unless otherwise stated

Use locktite 243 on all fasteners

Use loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Check fit of shafts in bearings

Check fit of following parts .


Shafts should pass through bearings with only slight resistance . All inner bearing faces should have contact to shaft and rotate when the shaft is turned


Proceed to step 4 if fit is correct


If shafts are tight check drawing and inspect size of shaft .


If shaft slides through easily, then follow step 3


D0001333 Roller Ø40 x 80 c/w bearing x 3

D0001334 Roller Ø40 x 102 c/w bearing x 3

D0003108 Shaft 20mm: 146mm Clamp Roller Shaft x 3

D0007942 Shaft 20mm: 119.4mm ZX Datum Roller Circlip x 3



Étape 3 - Degrease and bearing fit

...only follow this step is bearing/shaft fit is loose

Thoroughly degrease all parts with FE10 solvent


1 Fit 20mm external circlip to shaft


2 Fit roller to shaft


3 Add 3 drops of Loctite 641 bearing retainer to indicated area and smear around the shaft


4 Move shaft to shown position and add 3 more drops of bearing fit to indicated face and smear around


5 Position roller against circlip and remove any excess bearing fit with rag


6 Leave roller in a vertical position to allow bearing fit to cure


Étape 4 - Add circlip and fit roller

1 Fit 6 off 20mm external circlips to shafts as shown


2 Fit rollers to shafts


Étape 5 - Mount rollers

Fit rollers to D0007677 Infeed Base Rail (D2972) x 1 as shown and secure with M6 x 10 KCP grubscrews


Ensure dimples in shafts are located correctly to receive grubscrews



Étape 6 - Assemble Blower rails

Assemble blower rails as shown


1 D0010896


2 D0018097


Étape 7 - Mount blower rails

PICTURES REQUIRED


Mount blower rails to roller assembly


Use m3 x 20 pan heads to mount D0010897


Use m5 x 12 socket caps and A form washers to mount D0018096 ( do not use adhesive on these fasteners )

Étape 8 - Fit pipe work

PICTURES REQUIRED


Attach pipework as shown


Pipe identification number is 3609

Commentaires

Draft