R0015244 Frame ancillaries Fitting

Auteur avatarGareth Green | Dernière modification 16/08/2023 par Gareth Green en cours de rédaction

Introduction

Tools Required


115mm disc cutter

Standard Hex key set

Standard spanner set

Standard tape measure

Standard Tap set

Standard HSS drill set


Parts Required


A0001060 Support bracket :Cable basket Tray x 5

A0001061 Retainer: Wire Basket Cable Tray x 7

A0001065 Wire cable tray 3m length x 3

D0015611 Reference Levelling Bracket x 2


Étape 1 - Mount upper basket

Cut 1 piece of A0001065 Wire cable tray to the length shown ( 7 sections)

And drill to fit to indicted position on rear of blue support bar


Fix with 2 off A0001061 basket retainers as shown




Étape 2 - Mount lower support brackets

Fit 5 off basket support bracket to pre drilled holes at indicated points .

Secure using M8 x 20 socket caps and Large M8 washers

Étape 3 - Fit lower wire basket

Mount 2 full lengths of A0001065 wire basket to previous fitted brackets .


1 Join should be at central bracket between two sections and both baskets encapsulated with a retainer

2 Fix wire baskets to support brackets using 5 off A0001061

Use M6 x 20 button sockets, M6 penny washers and m6 nyloc nuts

Étape 4 - Fit Levelling brackets

2 off Leveling pads D0015611 fitted to indicated positions

Étape 5 - Position and drill

Position pad as shown and drill 1 off M6 tapped hole and secure with M6 x 20 socket cap and heavy washer. Use engineers level to level bracket, then mark and drill second M6 tapped hole.

Finalise fasteners, whilst using level to ensure bracket remains level on the indicated plain.

Repeat for 2nd pad position


Commentaires

Draft