R0015256 Pneumatic Connections

Auteur avatarGareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Pipe cutters

Number identification

Flush cutters


Parts Required

P0000160 Flow regulator 6mm inline x 2P0000551 6mm inline Quick Exhaust Fitting x 3

P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge x 1

P0001023 Fitting: SMC 6mm mini Y x 4

P0001030 Fitting: SMC 6mm Equal Tee x 27

P0001108 12mm Tee connector x 2

R0015071 Pneumatics rail

Étape 1 - Mount Pneumatic rail

Mount pre assembled pneumatic rail R0015071 into the position shown . Fix with M6 fasteners (size of fasteners and height of rail on frame required)


Étape 2 - Install Y244 material load sensor blowers

6mm Black air pipe

Identify all pipes as Y2449


  • Connect 2 off pipes to fitted P0000200 elbows (1) and add P0001023 mini y connector to pipes to convert to single feed pipe
  • attach long enough pipe to reach wire basket directly behind (2) . Ensure slack is left to allow for roller movement up
  • Add P0000160 Flow regulator
  • Add pipe to flow regulator fitting to reach main valve bank
  • Attach to indicated sections (3) of wire basket
  • Connect to (4 -active) port of valve slice


Étape 3 - Install Y125 Pop up C pipework

6mm black air pipe


Pipe identified as Y1259


9 off pop up C cylinders to be connected (1)


Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement


  • (1) 6mm tee feeds cylinder above and to the left
  • (2) 6mm tee feeds cylinder above and ring main left and right
  • (3) 6mm tee feeds cylinder above and ring main left and right
  • (4) 6mm tee feeds cylinder above and ring main left and right
  • (5) 6mm tee feeds valve below and ring main left and right
  • (6) 6mm tee feeds cylinder above and ring main left and right
  • (7) 6mm tee feeds cylinder above and ring main left and right
  • (8) 6mm tee feeds cylinder above and cylinder to the right

Étape 4 -

Étape 5 -

Étape 6 -

Étape 7 -

Étape 8 -

Étape 9 -

Étape 10 -

Étape 11 -

Étape 12 -

Commentaires

Draft