instructions for bench assembling x axis components
Auteur Gareth Green | Dernière modification 20/07/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
instructions for bench assembling x axis components
R0015028D_Bench_Assemble_X_Axis_components_and_Energy_chain_Screenshot_2023-06-12_123158.png
Tools Required
Pipe cutters
Cable / pipe markers
Parts Required
A0001077 x 5
A0001070 x 1
E0000439 x 2
E00001237 x 1Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all bolts to show finalised
Assemble energy chain using 154 links of A0001077 and 1 set of A0001070
1 Assemble moving end as shown. Ensure the indicated 4 links are rotated 180 degrees to the rest of the links on the energy chain
2 Assembly fixed end as shown
3 Quality check energy chain to make sure all linked are mounted in the correct orientation . Check that the 1st four are opposite and the remaining links are all orientated the same way
Identify the following with markers
E000439 cable marked as X294
E0000439 cable marked as X291
E0001237 cable marked as SX
3 off 6mm black air pipes 11 meters long marked as
Fit to energy chain ensuring no twists are present . All cables and pipes should run in straight limbs through the energy chain
1 Ensure the two plug ends and main servo end are exiting from the correct end of the energy chain
2 leave approximately 1 meter of pipes and cable exiting the indicated end