Bench assembly instructions
Auteur Gareth Green | Dernière modification 23/06/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Bench assembly instructions
R0015028D_Bench_Assemble_X_Axis_components_and_Energy_chain_Screenshot_2023-06-12_123158.png
Tools Required
Pipe cutters
Cable / pipe markers
Parts Required
A0001077 x 5.37
A0001070 x 1
E0000439 x 2
E00001237 x 1Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all bolts to show finalised
Assemble energy chain using 177 links of A0001077 and 1 set of A0001070
1 Assemble moving end as shown. Ensure the indicated 4 links are rotated 180 degrees to the rest of the links on the energy chain
2 Assembly fixed end as shown
Identify the following with markers
E000439 cable marked as X44
E0000439 cable marked as X283
E0001237 cable marked as X
3 off 6mm black air pipes 11 meters long marked as
Fit to energy chain ensuring no twists are present . All cables and pipes should run in straight limbs through the energy chain
1 Ensure the two plug ends and main servo end are exiting from the correct end of the energy chain
2 leave approximately 1 meter of pipes and cable exiting the indicated end
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #