R0015269 Fit Frame ancillaries

Auteur avatarGareth Green | Dernière modification 9/10/2023 par Gareth Green en cours de rédaction

Introduction

Tools Required


Parts Required

Étape 1 - Unless otherwise stated

Use loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connections

Pen mark all bolts to show finalised



Étape 2 - Fit basket brackets

Fit 6 off basket support bracket to pre drilled holes at indicated points .


Secure using M8 x 20 socket caps and Large M8 washers


Étape 3 - Fit first wire basket

1 Lay 1 full length of A0001065 wire basket between these points


2 Position end to be mid bracket


3 Allow overhang this end


Étape 4 - Fit 2nd wire basket

1 Measure and cut a piece of wire A0001065 wire basket to bridge between indicated points.


Étape 5 - Fit 3rd wire basket

2 Measure and cut section of A0001065 to bridge between point 2 indicated


Étape 6 - Fix wire baskets

Fix wire baskets to support brackets using 6 off A0001061


Use M6 x 20 button sockets, M6 penny washers and m6 nyloc nuts


Étape 7 - Add leveling pads

2 off Leveling pads D0015611 fitted to indicated positions



Étape 8 - Position and drill

Position pad as shown and drill 1 off M6 tapped hole and secure with M6 x 20 socket cap and heavy washer. Use engineers level to level bracket, then mark and drill second M6 tapped hole.


Finalise fasteners, whilst using level to ensure bracket remains level on the indicated plain.


Repeat for 2nd pad position


Étape 9 - Mount cabinet braces

Commentaires

Draft