installation of wiring loom and captivating spindle bases
Auteur Gareth Green | Dernière modification 27/02/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
installation of wiring loom and captivating spindle bases
Install_Wiring_loom_for_Rotary_loom_Screenshot_2023-05-31_100309.png
All bolts to have Loctite 243 adhesive applied unless otherwise stated
All bolts to be pen marked once adhesive applied and correct tension added
Check D0000291 spindle base has M4 hole tapped all the way through the plate. Rework if not
Wiring loom is started at position 6 as indicated by picture
1 Green and yellow Ethercat system cables route left to connection box 6
2 300 hz power cable and earth cable route to the right to connection box 7
3 Pre made 300 hz wiring loom . Identify Single end of loom marked as 7 connected to double crimped end marked as 6. Run between 7 and 6 as shown in image
4 Fit plate D0000291 using 2 off m8 x 25 socket caps. Only apply light tension to the m8 socket caps with no adhesive .
5 Once plate is fitted, ensure cables under are not trapped by checking movement is possible in the direction shown
6 Fit M0000025 number ident
From pre made cables, identify the following
24v power cable marked as 6 and 5
Green ethercat cable marked as 6 out - 5 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 Fit M0000025 number ident
24v power cable marked as 5 and 4
Green ethercat cable marked as 5 out - 4 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 Fit M0000025 number ident
24v power cable marked as 4 and 3
Green ethercat cable marked as 4 out - 3 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 5 Fit M0000025 number ident
24v power cable marked as 3 and 2
Green ethercat cable marked as 3 out - 2 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 5 Fit M0000025 number ident
24v power cable marked as 2 and 1
Green ethercat cable marked as 2 out - 1 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 5 Fit M0000025 number ident
24v power cable marked as 1 and 8
Green ethercat cable marked as 1 out - 8 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 5 Fit M0000025 number ident
24v power cable marked as 8 and 7
Green ethercat cable marked as 8 out - 7 in
1 Install 24v power cable as shown
2 Install green ethercat cable as shown
3 Install 300 hz power cable as shown
4 Attach next D0000291 plate as step 3
5 5 Fit M0000025 number ident
1 Assemble D0007990 cylinder anchor and D0007703 datum pin. Use
3mm x 26mm roll pin to secure together
2 Temporary fix to spindle plate with m6 x 20 socket caps
1 Fit r axis limit stop to main assembly . Use 6 off m8 x 40 socket caps with A form washers
Add 4 off 8mm x 24mm dowels to each spindle by hand to start . Use and hammer and drift to drive down dowel until it bottoms out in blind hole
1 Remove 2 off m8 x 25mm cap heads from each spindle plate
2 Apply adhesive and lay M8 x 25 cap heads in ALL spindle holes ready for fixing
3 Use drill driver with 6mm hex bit to drive all cap heads in. Set clutch to 14
4 Methodically apply final tension to bolt by hand and mark as complete
Add D0001176 infill plates to spindle plates 1,3,5 and 7
Add D0007611 infill plates to spindles 2,4,6 and 8
1 Place spindle infill plate in position threading through exiting cables
2 Place support block and small g clamp at position shown
3 Fit quick clamp to pin infill plate to ring base
4 Fit 3 off M5 x 20 socket caps to attach plate . Use a reduced length 4mm key for this
Repeat for all eight spindle plates
Cables must be adjusted between each spindle to ensure the cable lengths are correct .
1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail.
2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable
3 Repeat this process working your way around the spindles to set all ethercat cables
1 Start at cable point between 6 and 5 . Adjust black power cable to 200mm from edge of plate. See picture for details
2 Move to the next spindle connection between 5 and 4 and adjust the new black power cable to match the length of the previous adjusted cable
3 Repeat this process working your way around the spindles to set all power cables
1 Start at the connection point with 3 power cables exiting , and set the length to 150mm as per picture