R0000711 Rotary Base Assembly REV2

Auteur avatarGareth Green | Dernière modification 11/09/2024 par Gareth Green en cours de rédaction

Introduction

Detailed steps to correctly install rotary gear and journals

Checks for correct installation of oil feed system

Tolerance limits and requirements


Tools Required

Standard hex key set

0-25mm micrometer

Ring support blocks for assembly

Work Table

Parts required


D0006423-2mc Drive ring x 1

D0007651 Face plate x 1

Étape 1 - Quality Check Drive ring

Rotary drive ring needs checking before fitment.


  1. Check teeth for burrs, damage and debris. Use compressed air to clean all areas
  2. V edge should be checked for damage. Check entire circumference with fingers to identify any damage, lumps or high low spots
  3. Check drive ring has been countersunk in the shown area


Étape 2 - Prepare Faceplate For assembly

Check that D0007651faceplate holes indicated (1) are countersunk the same as holes indicated (2 ). If not , countersink to correct


3. Clean all holes with compressed air

Thoroughly clean faceplate with solvent

Étape 3 - Inspect Journal washers D0006503

Journal washers should be inspected to ensure all washers supplied are within tolerance .


Thickness of washer should not exceed 0.05mm difference between all washers supplied. Report any that are incorrect via NCR system


Étape 4 - Inspect Journals

B0000185 and B0000186 journals should be cleaned with compressed air and checked for quality. Visually inspect v grooves of journals for and damage or irregularities


Étape 5 - Check drive ring wipers

D0007692 should be checked for correct machining. Holes indicated are vital to allow oil flow to ring system once assembled.


Étape 6 - Position face plate

Face plate should be positioned ready for assembly


1 Support blocks should be placed either end of faceplate


2 Ensure correct end of faceplate is located at edge of workstation (end with 6 off M8 tapped holes on indicated face


3


Commentaires

Draft