Key Steps for mechanical installation of ZX5
Auteur Gareth Green | Dernière modification 13/12/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Key Steps for mechanical installation of ZX5
ZX5_Installation_Procedure_2023_Screenshot_2023-04-21_093450.png
Key data for installation of ZX5
Identify if either saw infeed or multi head outfeed is the logical frame to place first .
Consider access to machine when installing 1st frame
Consider handing of machine
Both frames will be initially levelled in the same way, and then fine tuned once multi head or saw is installed
Y axis levelling
X axis is initially set up using the hepco rail as a register. Once additional units are installed and levelled , this x axis setting will be re checked and adjusted if required