ZX5 Installation Procedure 2023

Auteur avatarGareth Green | Dernière modification 13/12/2023 par Gareth Green en cours de rédaction

Introduction

Key data for installation of ZX5


Dokit to generate consistency of installation

Étape 1 - Module Positioning

Identify if either saw infeed or multi head outfeed is the logical frame to place first .


Consider access to machine when installing 1st frame

Consider handing of machine

Étape 2 - Levelling of multi outfeed or saw infeed Y axis

Both frames will be initially levelled in the same way, and then fine tuned once multi head or saw is installed


Y axis levelling


  1. Only level the arms at the positions indicated, as these are the only arms that sit directly above adjustment feet
  2. Level support arms from the indicated face


Étape 3 - Levelling of multi outfeed or saw infeed X axis

X axis is initially set up using the hepco rail as a register. Once additional units are installed and levelled , this x axis setting will be re checked and adjusted if required