R0015243 ZX5 module A-C-E Frame levelling

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Method for levelling bare frames for modules A,C and F for ZX5/3 Preparing frame for production

Introduction

Procedure to prepare frame for build sequence


tasks to include


  • Cleaning of tapped holes
  • Adding level adjustment bolts
  • Levelling of frame

Étape 1 - Clean all tapped threads on frame to remove any debris from coating process

Tap all holes to remove debris.


Ensure all holes cleaned after tapping with compressed air


Étape 2 -

Commentaires

Draft