Details of the components replaced on a Flowline Overhaul
Auteur Gareth Green | Dernière modification 26/02/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Details of the components replaced on a Flowline Overhaul
overhaul Beckhoff_AX8000_Flowline_Upgrade_Pusher_Motor.JPEG
The Flowline was manufactured from 2000 to 2005, and all 76 machines are still in production today, outliving the expected design lifespan of 10 years and proving the machines’ long term reliability and suitability for the market place.
By 2019, 27 of the original machines have been fully overhauled and resold to new and existing customers, each with a full one year warranty from Stuga.
As with any cutting-edge technology, the drive systems and control components have been made obsolete by the original manufacturers, and so Stuga have kept up to date with an upgrade package to the latest control systems. The newer systems are more dynamic and reliable and allow these improvements to be passed on to the refurbished machines. A refurbished model is faster, more reliable and easier to use than the original model.
Component | Location | Quantity | Picture |
Beckhoff Control PC | Machining Centre Cabinet | 1 | |
Beckhoff IO Modules | Machining Centre Cabinet
Transfer Table Cabinet Saw Cabinet |
3 | |
Beckhoff AX8000 series Dual Servo Drives | Machining Centre Cabinet | 3 | |
Front End Interface PC and Touchscreen Monitors (Windows 10) | Machining Centre Cabinet | 1 | |
Beckhoff Servo Motors and Cabling | X axis, Y axis, Z axis
R axis, Saw Pusher |
6 | |
Gearboxes | X axis, Saw Pusher, R axis | 3 |
All overhaul machines are supplied with the Tru-Loc gripper system, a dual-tooth fixed gripper design that accurately and reliably locates into the profile
This improves the original Flowline design and brings it in line in terms of performance with a modern “ZX3” machine.
What is involved?
The upgrade consists of a mechanical and electrical upgrade to the ring spindles. Four of the current spindle heads will be removed, and in their place are fitted 4 higher power, higher speed units, with two “Double Plunge” assemblies. This improves the machining cycle time of trickle vents, doors and letter boxes by over 300%. The improvements are gained by using higher specification spindle motors, higher quality tooling and (if applicable) by machining both sides of the profile at the same time. With these changes, it is possible to improve the current machine output by up to 50%, depending on your machine setup. A full assessment of the time saved can be undertaken on your machine on request.
How can it be so much faster?
Apart from the obvious fact of cutting both sides of the profile at the same time, there are other speed improvements:
Standard Flowline | With Upgrade | |
Spindle Speed | 11,000 rpm | 18,000 rpm |
Spindle Power at Tool | 0.2kW | 0.75kW |
Tooling | Standard | Carbide |
Time Taken for 4000 Trickle Vent | 55 sec | 15 sec |
Time Taken for Door Handle Prep | 90 sec |
Stuga have designed an addition to the sawing module of machine which gives the saw side the ability to create the Y notch pattern in one prep. This consists of a square then mitre cut using a variable offset central position to give the CNC depths of Y notch. The operation works much like an arrow-head cut. The advantages are
Upgrade Includes:
Note: Due to the constraints of the original design, the Y notch facility has limitations on range. It is designed to cover over 95% of production, but cannot (for instance) Y notch a shallow notch in a wide transom, or wide notch in a narrow transom / outer)
The machine will produce Y notches outside of this range but utilises the machining head to produce the square cut portion of the cut.