R0000712F Rotary Trunking

Auteur avatarGareth Green | Dernière modification 24/09/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required

Standard set Hex keys

Standard socket set

Countersink bit and drill

Copper/hide hammer

Standard hss drill set

Hack saw

File


Parts Required

D0006210 pre assembled energy chain

D0003929 Access panel

D0003930 Circular guide

D0003985 Upper circular guard

D0007817 Circular guard

D0001171 plug bracket


Étape 1 - Adhesive

All bolts must have Loctite 243 adhesive applied unless otherwise stated.

All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied



Étape 2 - Prepare 1st guide Section

D0003985 needs preparing before fitting


1 All back plates for the rotary trunking need to be checked for correct countersink depth. Any protrusion from main face will case energy chain failure

Check and if proud, use a countersink to increase depth


Étape 3 - Fit Energy chain mounting bracket

1 Measure position of bracket onto circular guard (291mm)

2 Use a pointed m5 grubscrew screwed into bracket hole indicated, hold in position on guard, and use hide hammer to transfer position mark

3 Drill to 6mm and fix bracket with m5x 16 cap head and large m5 washer

4 Drill 6mm through indicated hole

5 Fix with M5 x 16 countersink, large m5 washer and nyloc nut

6 This countersink bolt head must be flush to block. If proud, use a countersink bit to increase depth

Étape 4 - Prepare second section

Check countersink holes in D0003930 are to the correct depth . Rework with countersink if fasteners sit proud.



Étape 5 - Prepare 3rd section

Check countersink holes in D0007817 are to the correct depth . Rework with countersink if fasteners sit proud.



Étape 6 - Orientation

It is vital to achieve correct orientation of above parts


Use M8 holes indicated as reference point for fitting


Étape 7 - Fit D0007817

Mount D0007817 to main rotary base and fix with m5 x 10 countersink bolts



Étape 8 - Fit D0003930

Mount D0003930 to main rotary base and fix with m5 x 10 countersink bolts



Étape 9 - Fit D0003985

Mount D0003985 to main rotary base and fix with m5 x 10 countersink bolts



Étape 10 - Fit locking screw to energy chain

Drill and tap m3 to plugged end ONLY of energy chain assembly


Use m3 x 6 pan head bolt to secure

...Caution damage to cables is possible Use a shield over cables to protect



Étape 11 - Clarification added to next step on position of cut out on connection plug

Please ensure the following step is noted and replicated


This is to ensure the cable and 6mm pipe are located in the correct area on assembly



Étape 12 - Mount and mark Connection plug

Étape 13 - Prepare 1st guide Section

D0003985 needs preparing before fitting


1 All back plates for the rotary trunking need to be checked for correct countersink depth. Any protrusion from main face will case energy chain failure

Check and if proud, use a countersink to increase depth


Étape 14 - Fit Energy chain mounting bracket

1 Measure position of bracket onto circular guard (291mm)

2 Use a pointed m5 grubscrew screwed into bracket hole indicated, hold in position on guard, and use hide hammer to transfer position mark

3 Drill to 6mm and fix bracket with m5x 16 cap head and large m5 washer

4 Drill 6mm through indicated hole

5 Fix with M5 x 16 countersink, large m5 washer and nyloc nut

6 This countersink bolt head must be flush to block. If proud, use a countersink bit to increase depth

Étape 15 - Prepare second section

Check countersink holes in D0003930 are to the correct depth . Rework with countersink if fasteners sit proud.



Étape 16 - Prepare 3rd section

Check countersink holes in D0007817 are to the correct depth . Rework with countersink if fasteners sit proud.



Étape 17 - Orientation

It is vital to achieve correct orientation of above parts


Use M8 holes indicated as reference point for fitting


Étape 18 - Fit D0007817

Mount D0007817 to main rotary base and fix with m5 x 10 countersink bolts



Étape 19 - Fit D0003930

Mount D0003930 to main rotary base and fix with m5 x 10 countersink bolts



Étape 20 - Fit D0003985

Mount D0003985 to main rotary base and fix with m5 x 10 countersink bolts



Étape 21 - Fit locking screw to energy chain

Drill and tap m3 to plugged end ONLY of energy chain assembly


Use m3 x 6 pan head bolt to secure

...Caution damage to cables is possible Use a shield over cables to protect



Étape 22 - Clarification added to next step on position of cut out on connection plug

Please ensure the following step is noted and replicated


This is to ensure the cable and 6mm pipe are located in the correct area on assembly



Étape 23 - Mount and mark Connection plug

1 Fit pre assembled R0015304B energy chain assembly plug connection into bracket D00001171 as shown. Note plug has 2 different widths, larger width must be captivated in bracket to ensure secure fitting

2 Mark the indicated area

3 Remove plug connection from bracket and remove marked area using hacksaw and dress with file

4 Refit to bracket, captivating ethercat cable and 6mm blue pipe from energy chain assembly as shown

5 Secure with M4 x 12 socket cap

Étape 24 - Mount energy chain

1 Fix energy chain bracket as shown using 2 off m5 x 10 button heads and heavy washers

2 Add cable retention point. Fit small A0000248 tie base and secure with M4 x 6 button head


Étape 25 - Mount plug bracket

Fit assembled plug and bracket into position. Secure with 2 off M5 x 10 button sockets


Étape 26 - Finalise energy chain cables

1 Set ethercat cable and 6mm blue pipe to the length shown of 580mm


2 Fit tie wrap to cable restraint point once cable and pipe length are set

Étape 27 - Fit Access panel

1 Slide access panel into position

2 Fix energy chain to panel with m5 x 16 button heads, washers and nyloc nuts



Commentaires

Draft