Installation of rotary energy chain and back plates
Auteur Gareth Green | Dernière modification 24/09/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Installation of rotary energy chain and back plates
R0000712E_Rotary_Trunking_Screenshot_2023-05-31_080328.png
Tools Required
Standard set Hex keys
Standard socket set
Countersink bit and drill
Copper/hide hammer
Standard hss drill set
Parts Required
D0006210 pre assembled energy chain
D0003929 Access panel
D0003930 Circular guide
D0003985 Upper circular guard
D0007817 Circular guard
D0001171 plug bracket
P0001023 6mm y adapter x 9
P0000401 non return valveAll bolts must have Loctite 243 adhesive applied unless otherwise stated.
All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied
D0003985 needs preparing before fitting
1 All back plates for the rotary trunking need to be checked for correct countersink depth. Any protrusion from main face will case energy chain failure
Check and if proud, use a countersink to increase depth
Mounting bracket D0006240 needs fitting to D0003985
1 Measure position of bracket onto circular guard (291mm)
2 Use a pointed m5 grubscrew screwed into bracket hole indicated, hold in position on guard, and use hide hammer to transfer position mark
3 Drill to 6mm and fix bracket with m5x 16 cap head and large m5 washer
4 Drill 6mm through indicated hole
5 Fix with M5 x 16 countersink, large m5 washer and nyloc nut
6 This countersink bolt head must be flush to block. If proud, use a countersink bit to increase depth
Check countersink holes in D0003930 are to the correct depth . Rework with countersink if fasteners sit proud.
Check countersink holes in D0007817 are to the correct depth . Rework with countersink if fasteners sit proud.
It is vital to achieve correct orientation of above parts
Use M8 holes indicated as reference point for fitting
Drill and tap m3 to plugged end ONLY of energy chain assembly
Use m3 x 6 pan head bolt to secure
Please ensure the following step is noted and replicated
This is to ensure the cable and 6mm pipe are located in the correct area on assembly
1 Fit pre assembled R0015304B energy chain assembly plug connection into bracket D00001171 as shown. Note plug has 2 different widths, larger width must be captivated in bracket to ensure secure fitting
2 Mark the indicated area
3 Remove plug connection from bracket and remove marked area using hacksaw and dress with file
4 Refit to bracket, captivating ethercat cable and 6mm blue pipe from energy chain assembly as shown
5 Secure with M4 x 12 socket cap
1 Mount bracket D0001171 using 2 off m5 x 10button heads and heavy washers
2 Captivate plug with m4 x 12 socket cap
1 ensure 600mm of green ethercat cable is set
2 ensure 6mm blue pipe is set to position
3 Ensure cable restraint is used once cable and pipe length are set ( M4 may need drilling )
1 slide access panel into position
2 Fix energy chain to panel with m5 x 16 button heads, washers and nyloc nuts
1 Connect ring main as shown. Ensure fittings P0001023 are placed in the same locations as shown in picture
2 Cap off 8 off ends of air pipe as shown
3 Add P0000401 to end of trailing 6mm blue pipe. Note orientation of non return valve
4 Purge system with air to perform pneumatic leak test. Once purged, system should hold pressure for minimum 1 hour
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #