R0000728 R0000729 Stroke Assembly Dismantling

Auteur avatarGareth Green | Dernière modification 4/06/2024 par Gareth Green en cours de rédaction

Instructions for refurbishment of R0000728 and R0000729 stroke assemblies using Kit R0000299

Difficulté
Très difficile
Durée
8 heure(s)

Introduction

Assemblies fitted to MK1 ZX4 will require refurbishment at some point of life cycle.


The following instructions should be followed to ensure that correct assembly and setting are performed


Tools / consumables Required


Standard hex key set

Standard spanner set

Double pin saw flange spanner

Drifts and punches

Ballpein hammer

Soft hammer

Degreasing bath

Solvent Fe10

Loctite 243adhesive

Loctite 641 bearing fit

Thixotropic grease


Parts Required


Kit R0000299 containing


B0000043 Double Angular bearing 15 I?D 35 O?D 15.9 long rubber seal 3 x 2

B0000105 Double Angular Bearing 15 I/D 35 O/D 15.9 Long x 1

B0000335 3ph Brake motor 2 pole 3000rpm x 1

B0000380 Double Angular Bearing 25 I/D 52 O/D 20.6 Long + rubber seal x 2

D0000059 Damper Bridge x 1

D0000062 Damper Bridge Boss x 2

D0007730 ZX4 V Notch Mk1 Spindle Shaft x1

D0007867 Bevel Gear (Left) x 1

D0007868 Bevel Gear (Right ) x 1

D0007873 Motor Gear x 1

D0007874 Pinion Gear x 1

D0007875 Pinion Shaft x 1



Étape 1 -

Commentaires

Draft