Correct alignment protocol for subframe alignment
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Correct alignment protocol for subframe alignment
R0002913E_Install_and_Align_Rotary_head_Subframe_Screenshot_2023-07-27_113910.png
Tools Required
300mm engineers level
2 meter straight edge
1 meter straight edge
Standard hex key set
Standard spanner set
Z support jigs
Parts Required
D0000095 Bottom Plate x 2
D0006484 Front Tiebeam x 1
D0006485 Rear Tiebeam x 1
D0007681 Shaft Adjust Plate x 2
D0007683 Lower Beam Mount x 1
D0007684 Lower Beam Mount - Mirror x 1
D0007695 Platform (D8714) x 1
D0007787 Upper Beam Mount x 1
D0007835 Hard Stop x 2
D0008087 Z Servo Housing x 2
H0006025 Shaft 40mm: 939mm Flowline Y-axis x 2
H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2
R0015296 Bench Assemble bearings Assemblies
Use loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all bolts to show finalised
1 Use engineers level to level frame at the indicated points . Any discrepancy between the two faces should be adjusted to be even both sides .
2 Use 2 meter straight edge and 300mm engineers level to level Y axis of machine at the indicated points
Mount and orientate D0007787 Upper Beam Mount x 1 as shown
Fix with M12 x 70 socket caps and A form washers , do not apply adhesive
Add 8 off M10 x 35 flat bottomed grubscrews
When mounting top beam, ensure beam is set evenly on frame mounts as shown
1 Level X axis on both sides of the beam at the indicated point using M10 grubscrews to adjust
2 Adjust Y Axis using grubscrews . only adjust one end up, as height needs to remain as close as possible to frame mounting point.
Use 1 meter straight edge and engineers level
3 Check and adjust flatness by using 1 meter straight edge to gauge. Bias can be used on jacking grubscrews to manipulate the upper beam mount flat.
1 Mount H0007711 Shaft 40mm: 1350mm Microline Z (c/w M16 x 45 bolts) x 2
and suspend in place with M16 x 45 hex head bolts and D0007681 Shaft Adjust Plate x 2
Add 2 off large black tie wraps per side as shown
2 Fit 2 off bearing block from R0015296 Bench Assemble bearings Assemblies to z shafts orientated as shown.
M6 holes should face centre of machine and M8 holes and 8mm dowel holes should face front of machine
1 Prepare 6mm dowel holes indicated with 6mm reamer in D0007695 Platform
2 Lightly attach as shown 2 off D0008087 Z Servo Housing using 4 off M8 x 40 socket caps and A form washers per block
3 Fit 4 off 6mm x 30 dowel to align blocks
4 Finalise M8 socket caps
5 Check with 40mm shaft jig that alignment is correct and shaft can pass through assembled 40mm bore
1 Ensure2 off dimples on each main vertical shaft are facing the rear of the machine
2 Slide into position centre platform assembly ensuring the correct orientation is achieved in regards to Machined pockets on the centre platform
3 Align dimples to M8 tapped holes in crossmember and fix with 4 off M8 x 16 kcp grubscrew
4 Fit 2 off bearing block from R0015296 Bench Assemble bearings Assemblies as shown. Blocks should be orientated as previous fitted upper blocks
Do not use any adhesive on these fasteners in this step
Fit
D0007683 Lower Beam Mount x 1
D0007684 Lower Beam Mount - Mirror x 1 as shown
1 Use M10 x 70 socket caps , A form washers and standard M10 nuts to fix as shown
2 Insert 4 off M10 x 30 flat bottomed jacking grubscrew as shown
1 Apply Medium tension to M10 socket caps and wind down M10 jacking grubscrews to touch on frame
2 Level X axis of block using pair A or B, never use all 4
3 Level Y axis of block using pair A or B, never use all 4
Repeat for other side
4 Level across beam mounts using 2 meter straight edge. Adjust lowest platform to correct any error . Always use all 4 jacking grubscrews turned exactly the same amount to raise platform to adjust
5 Once levelled, check no gaps are present on contact face of straightedge along both lower beam mounts
1 Insert 1 off M8 x 16 kcp grubscrew per lower beam mount and apply light pressure with no adhesive
2 Release pressure on M10 socket caps that hold lower beam mounts in place
3 Use straight edge as indicated
4 Adjust lower beam mount position using level as indicated . Once level is achieved, apply light pressure to M10 socket caps and repeat for other side
5 Adjust Lower beam mount position using a level as indicated . Repeat on other side
1 Use Z shaft slip gauge to measure pitch of shafts at upper point shown . Measure gap using feeler gauges
2 Check shaft pitching at lower point shown , this must be set to replicate upper measurement . Adjust lower beam mounts to adjust this measurement
Attach 2 off D0000095 bottom plate as shown
1 Use 2 off M8 x 30 socket caps with A form washers to fix each plate .
2 Use M8 x 70 Set bolt with standard M8 nut and A form washer in central hole
3 Tension M8 nut only when level is on top of plate above so no movement occurs
Check the following points
1 Level Check
2 Level check
3 Level check
4 Level check
5 Alignment and Level check
6 Alignment check
Supervisor sign off required
Check the following
1 Z shaft M16 set bolts are glued and finalised
2 4 off Grubscrews are finalised
3 2 off grubscrews are finalised
4 M10 socket caps are finalised