R0015034B ZX5 Module B Wiring Loom installation

Auteur avatarGareth Green | Dernière modification 27/02/2024 par Stuga Engineer en cours de rédaction

Introduction

Parts Required


Pre labelled Wiring loom assembly R0015034B from electrical team


Tools required


Flush cutters

Tie wraps small

Tie Wraps Large


Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Ring Toolbreak connections

{Pictures show L-R configuration. For R-L use additional tie base shown


1 Use cables X56 and X488 from loom box.

2 Connect as shown to sensor and flying lead X488

3 Cut and label 1 off 6mm black air pipe 2699 @ 5 mtrs

4 Loom as shown utilising tie bases as indicated

Étape 3 - R axis motor connection

Use cable marked as R axis from loom box


1 Connect to servo motor, and fit protective cover to finalise .Ensure panel edging strip is fitted to indicated faces shown

2 Captivate cable onto gearbox as shown with large tie wraps

3 Fix to rear faceplate using M4 tie base. Ensure cable sits free of main shaft

4 Fix cable as shown using large tie bases

Étape 4 - Loom Rotary ring cables and pipes

Loom cables and pipe from rotary head, fix with 2 off small tie bases



Étape 5 - Energy chain

Run cables from step 2-4 through energy chain, ensuring no twists are present. Cables X56 and X488 and pipe 2699, need to be run through link 2 not the end of the energy chain. Link 2 is the ring end of the energy chain, not the frame end.


Ensure cable retention points are used at both ends of energy chain .


Use P0000046 Y connector and P0000159 6mm blank to direct 2699 pipe as shown ( this is required to ensure pipe does not kink when entering energy chain)


Ensure that rotary head is moved fully in both directions side to side to ensure that loom lengths entering the energy chain are correct and no tension is applied to cable looms



Étape 6 - Route R axis Cable

1 Route R axis cable as shown through trunking


2 Pass large servo plug through vertical trunking dogleg .


...Plug will fit through, but takes care and correct orientation

3 Exit cable from frame at rear as shown



Étape 7 - Route Z axis

1 Retrieve cable identified as Z axis from loom box

2 Pass small plug through trunking grommit shown and connect to servo motor

3 Route and exit rear as shown



Étape 8 - X50 Y axis datum

1 Retrieve X50 from wiring loom box , and Fit to Y axis datum point

2 Attach cable tie bases small and route cable as shown

Étape 9 - Y Axis servo connection

1 Identify Y axis cable from loom box


2 Connect and loom as shown , incorporating previous fitted X50 cable


3 Run through energy chain as shown, ensure cable retention points are used

4 Route servo cable through trunking as shown

5 Exit machine at rear as shown

Étape 10 - Fit Ethercat Box FB01B

Fit C0001018 from wring loom box to area shown . Must be fitted to same side as clamp assembly


Use 2 off m3 x 20 pan heads to fix


See diagram for clarity


Étape 11 - Fit Ethercat box FB02B

Fit C0001018 from wring loom box to area shown


Must be fitted to same side as rotary ring cable exit point


This position does not change with L-R or R-L variants


Use 2 off m3 x 20 pan heads to fix


See diagram for clarity


Étape 12 - Fit Ethercat FB03B

Fit c0001129 ethercat box from wiring loom assembly to point shown


This position does not change with L-R or R-L variants


Use 2 off m3 x 20 pan heads to fix


See diagram for clarity


Étape 13 - Fit Ethercat FB04B

Fit C0001018 from wring loom box to area shown


This position does not change with L-R or R-L variants


Use 2 off m3 x 20 pan heads to fix


See diagram for clarity


Étape 14 - Connect EC07B

Loom Cable EC07B from trunking as shown and connect to out port on FB04B


Étape 15 - Connect EC06B

Loom Cable EC06B from FB04B in port to FB03B out port as shown


Étape 16 - Connect EC05B

Loom Cable EC05B from FB03B in port to FB02B out port as shown


Étape 17 - Connect EC04B

Loom Cable EC04B from FB02B in port to FB01B out port as shown


Étape 18 - Connect EC03B

Loom Cable EC03B from FB01B in port to shown exit point on frame


Commentaires

Draft