Pneumatic installation details for ZX5 module B
Auteur Gareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Pneumatic installation details for ZX5 module B
R0000738_Pneumatic_Installation_Screenshot_2023-11-01_113948.png
Tools Required
Pipe cutters
Pipe identification numbers
Parts Required
D0015703 Air Gun Bracket x 1
P0000010 Elbow Adaptor 6mm - 1/8 BSPT (Taper thread) x 2
P0000046 Fitting: 'Y' Adaptor 6mm x 4
P0000053 6mm T (P16) x 2
P0000075 Parallel Y Connector 8mm x 1
P0000077 Straight Adaptor 8mm - 1/8BSP x 3
P0000160 Fitting: Flow Controller In Line 6mm x 4
P0000161 Plug-in Reducer 6mm Tube 8mm Fitting x 6
P0000401 6mm inline non return valve x 2
P0000470 Valve: 5/2 PnPnu 1/8BSP x 1
P0000513 Ball valve with QS connector x 1
P0000551 6mm inline Quick Exhaust Fitting x 6
P0001106 Plug in reducer 12mm to 8mm x 7
P0001107 12mm Y connector x 8
R0015114 Bench Assemble Valve banks and Regulators
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Pipe id 2699
Pipe trailing from rotary head energy chain
Route into trunking and exit as shown to valve bank
Blank port 2
Pipe id 2701
Connect to port 2 on valve bank
Through trunking as shown
Connect to Nose of clamp hold cylinder
Pipe id 2709
Connect to port 4 on valve bank
Through trunking as shown
Leave 2 meter tails on both pipes exiting the trunking
Handing. Pipes always exit trunking as shown next to side clamp assembly
Pipe id 3501
Connect to port 2 on valvebank
Through trunking and exit at point shown
Pipe id 3509
Connect to port 4 of valvebank
Through trunking and exit at point shown
Pipe ID 3502
Run pipe between points shown
Pipe ID 3511
Connect to port 2 on valve bank
Through trunking and exit at point shown
Pipe ID 3519
Connect to port 4 on valvebank
Through trunking and exit as shown
Pipe ID 3512
Through trunking and exit as shown
leave pipes coiled up ready for later connection
Pipe Id 3609
Connect to port 4 on valvebank
Blank port 2
Route through trunking and exit as shown.
Leave 1.5meters of pipe from trunking exit
Handing, pipe will always exit trunking at side shown opposite to side clamp connections
Pipe 3861
From port 2 of valvebank directly up to clamp area shown
3862 routes from clamp area to point shown out of trunking
3863 routes from clamp area to point shown out of trunking
3869 connects from port 4 on valve bank and routes to trunking exit point as shown
Connect pipe 3891 to port 2 of valve bank and route as shown . Leave 1 meter tail exiting trunking
Connect pipe 3899 to port 4 of valve bank and route as shown . Leave 1 meter tail exiting trunking
Handing. Pipe exit will always be the trunking closet to the support cylinder with air adjustment fittings
Amendment . Top clamp cylinder now using 2 off standard P0000010 elbows and 2 off P0000160inline flow regulators for easier access
Pipe ID 3891
Connect port 2 of valve bank to port 12 of 5/2 valve
Connect port 2 of 5/3 valve to base of VZ cut cylinder with 8mm black air pipe
Pipe ID 3899
Connect port 4 of valve bank to port 10 on 5/3 valve
Connect 4 on 5/3 valve to nose of VZ cut cylinder with 8mm black airpipe
Cut 8mm Y connector into pipe alongside cylinder and and fit 8 to 6mm reducer
Connect 6mm black airpipe from y connector to pilot check valve at base of cylinder
Pipe ID 3951
Connect port 2 on valve bank
Through trunking
Add 6mm Y connector to create 2 3951 feed pipes
Connect to noses of top and side v notch clamps
Pipe ID 3959
Connect to port 4 of valve bank
Through trunking
6mm tee connector
Feed both IN ports on Y395 top clamp and Y395 side clamp regulators
Pipe ID 3952
Connect OUT port on Y395 top clamp regulator
Through trunking
Connect to inline flow regulator
Connect to base of v clamp top cylinder . P0000551 QEV must be fitted
Pipe ID 3953
Connect to OUT port on Y395 V clamp side regulator
Connect to inline flow regulator near cylinder
Connect inline flow regulator to base of side clamp cylinder . P0000551 must be fitted next to cylinder
Connection for 12mm ring main as follows
Front lower 12mm bulkhead to connect to 12mm Y connector at point A indicated
Add 12mm to 8mm reducer then 8mm to 6mm reducer into Y fitting and connect 6mm blue airpipe to feed up to point B
Connect previous fitted Y connector to a new 12mm Y connector at point A
Add 12mm blue pipe to feed valve bank , exit pipe through slot to feed valve bank
Connect previous 12mm Y connector to new 12mm Y connector at point A
Use 12mm to 8mm reducer and connect 8mm blue air pipe , feed out of grommit and supply 5/3 v notch valve
Connect previous fitted 12mm Y connector to rear lower panel 12mm bulkhead .
Run pipe along rear basket
Connect 6mm blue feed pipe to non return valve at indicated point
Connect 6mm Y connector to non return valve
Connect feed pipe from ring assembly to one port of Y connector
Connect 6mm pipe to second port of Y connector and run pipe to point B
Add P0000513 q ball valve
Connect 6mm blue pipe to Q valve to run into energy chain and act as exhaust
Connect 1st 12mm bulkhead on lower front panel with 12mm red pipe
Add 12mm Y connector at point A and fit 12mm to 8mm reducer then add 8mm red pipe to exit trunking and feed Air gun regulator port IN
Add new 12mm Y Connector at point A and connect to previous Y connector .
Add 12mm to 8mm reducer and 8mm to 6mm reducer to provide 6mm red pipe to feed to Z support cylinder regulator port IN
Add P0000501 non return to 6mm red pipe just before entry into In port
Add 12mm Y connector at point indicated and connect to previous 12mm Y connector
Add 12mm to 8mm reducer and connect 8mm red pipe to feed VZ regulator port IN
Add 12mm Y connector at point A
Add 12mm to 8mm reducer, then 8mm to 6mm reducer , then connect 6mm red pipe to exit through grommit and feed pilot valve on z support cylinder 1
Connect previous fitted 12mm Y connector to rear 12mm bulkhead fitting
run pipe along wire basket at rear
Connect 12mm red pipe front front 12mm bulkhead to Y connector at indicated point
fit 12mm to 8mm reducer then 8mm to 6mm reducer and connect 6mm red pipe to feed pilot valve on z support cylinder 2
Connect previous fitted Y connector to rear bulkhead with 12mm pipe
Connect 6mm red pipe to Out port on Z support cylinder
Add 6mm Y connector and connect 2 off 6mm red airpipes to route into trunking and feed both Z support check valves
Connect 8mm red pipe to OUT port on VZ support regulator and feed base QEV valve on VZ support cylinder
Add 6mm black airpipes to QEV on z support cylinders
Run through trunking to exit point indicated
Connect to blowers on swarf chute
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #