Instructions to instal Pneumatic connections onto module
Auteur Gareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions to instal Pneumatic connections onto module
R0015256_Pneumatic_Connections_Screenshot_2023-07-13_125718.png
Tools Required
Pipe cutters
Number identification
Flush cutters
Parts Required
P0000160 Flow regulator 6mm inline x 2P0000551 6mm inline Quick Exhaust Fitting x 3
P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge x 1
P0001023 Fitting: SMC 6mm mini Y x 4
P0001030 Fitting: SMC 6mm Equal Tee x 27
P0001108 12mm Tee connector x 2
R0015071 Pneumatics rail
A0000343 energy chain x 1
A0000344 energy chain bracket set x 1
D0015577 fixed energy chain bracket x 1Mount pre assembled pneumatic rail R0015071 into the position shown . Fix with M6 fasteners (size of fasteners and height of rail on frame required)
6mm Black air pipe
Identify pipe as 2449
6mm black air pipe
Pipe identified as 1259
9 off pop up C cylinders to be connected (1)
Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement
6mm black air pipe
Pipes identified as 1249 and 1241
Cylinder nose 1249
Cylinder base 1241
(1) (2) (3) (4) connect all as shown using 6mm tee fittings position (1) feeds roller to the left as well as one above
(4) Feeds ring main to valve
(5) Feeds cylinder above and ring main to the right
(6) Feeds cylinder above and ring main to the right
(7) Feeds cylinder above and cylinder to the right
pipe identifications
1269 and 1279
Fitting on cylinder closest to extractor should be 1279
Other fitting will be 1269
1269 pipe should connect to B on valve 1279 should connect to A on valve
Connect with 10mm black airpipe to standalone valve
Electrical connection will match port connections of two pipes
Identification as
2329 2339 2349
Home port (2) should be blanked at valve bank
Run from active port on valve bank (port 4) to transfer beam number 4 .
Fit A000343 energy chain @44? links
A0000344 energy chain brackets as shown
Mount to D0015577 fixed bracket and attach to support arm as shown
Must have a P0000551 qev fitted to each line
It is vital that when installing pipes into the main X axis energy chain, that cable retaining points are used
All cables and pipes should be secured with tie wraps to the 'fingers' on the energy chain brackets at BOTH ends
Gripper height is lifted for home position
identification
1211 Home port of valve bank (2) to nose of cylinder
1212 base of cylinder to out port on regulator
1219 In port of regulator to active port on valve bank (4)
Identification 1229
Must have flow regulation P0000160
Connect to active port (4) on valve bank
Connect 12mm blue airpipe from valve banks to end of frame for machine connections. Ensure 3 meters of pipe is trailing from basket, ready for connection to ring main at a later point