R0015114 Bench Assemble Valve Banks and Regulators

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard spanner set

Standard HSS drill set

Standard tap set


Parts Required


H0007998 Regulator internal mount 5 way x 1

P0000010 Elbow Adaptor 6mm - 1/8 BSPT (Taper thread) x 14

P0000020 Fitting: Plug 1/8" BSP (Grubscrew Type) x 9

P0000021 air gun assembly x 1

P0000024 hex nipple 1/4 x 3

P0000058 Regulator Mounting Kit x 1

P0000074 Elbow Adaptor 8mm - 1/8 BSP (Pneumax not acceptable) x 2

P0000096 Fitting: Brass Reducing Bush 1/2 - 1/4 x 2

P0000142 Elbow Adaptor 8mm - 1/8 BSP x 2

P0000145 tee equal 1/4 x 3

P0000159 Fitting: Stem Blanking Plug 6mm x 2

P0000277 Fitting: Bulkhead Female 8mm x 1/4 BSP x 1

P0000278 Regulator 0-2 bar x 1

P0000332 Regulator with Gauge G1/8'' 0-8 bar x 8

P0000361 1/4'' Male Probe to suit 1/4'' PCL Female coupling x 1

P0000419 Air Service Unit OH (P0283) x 1

P0001071 Valve base type41 8 position x 1

P0001074 Fitting: 1/4" BSP Hex Head Silencer x 4

P0001101 Male straight 1/4 bsp to 12mm x 1

P0001102 Fitting male elbow 12mm 1/4 x 4

P0001105 Bulkhead straight 12mm x 6

P0001186 Valve. 24v dc smc x 8


Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Ecr raised

Ecr raised to amend regulator bracket to remove redundant holes and add fixing holes for valve bank


Use part as is until process to update is complete


Drill regulator bracket M4 to suit valve base


Étape 3 - Assemble valve bank

Assemble valve bank


1 Prepare parts

2 Fit gasket to valves . Ensure gasket sits flat and aligned

3 Fit valves to valve bank base

4 Attach Air feed connection and exhausts

5 Add 6mm blanks

Étape 4 - Attach valve bank

Attach valve bank to regulator bracket using 4 off M4 x 40 socket caps , M4 washers and M4 nyloc nuts


Étape 5 - Assemble regulators

Ensure in and out ports at 90 degrees to each other are used as shown

1 Assemble 7 off regulators with 6mm elbows and spare port blanked


2 Assemble 1 off regulator with 8mm elbows and spare port blanked


Étape 6 - Assemble Air service unit

Assemble air service unit



Étape 7 - Mount air service unit

Mount air service unit to front lower panel



Étape 8 - Mount regulators

Mount regulators to front lower panel


As viewed from front, bottom right regulator should have 8mm fittings



Étape 9 - Mount bulkheads

Mount 3 off 12mm bulkheads to lower panel



Étape 10 - Assemble and mount 0-2bar regulator

Assemble and mount 0-2 bar regulator to lower front panel



Étape 11 - Fit and connect air gun assembly

Fit 8mm bulkhead to lower front panel


Fit air gun assembly


Connect 8mm red pipe from reg OUT to bulkhead



Étape 12 - Fit cable gland

Fit cable gland for air service unit



Étape 13 - Fit labels for regulators

Print and Attach labels for regulator's


Labels to be added both sides of panel


From top left to bottom right


Y350 Clamp Infeed Top

Y351 Clamp Infeed Side

Y386 Clamp Middle Top

Y386 Clamp middle Side

Y395 Clamp V Top

Y395 clamp V Side

Z Axis Support

VZ Axis Support



Étape 14 - Lower rear panel bulklheads

Fit 3 off 12mm bulkheads to rear lower panel



Étape 15 - Label bulkheads

Print and fit Labels to identify bulkheads as


12mm red 2 off

12mm blue 1 off



Commentaires

Draft