Details to install pneumatic and electrical loom
Auteur Gareth Green | Dernière modification 27/02/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Details to install pneumatic and electrical loom
R0015146_Pneumatic_pipe_Installation_Part_3_Screenshot_2023-12-14_145058.png
This instruction is to incorporate assembly R0015033B Module F Wiring loom alongside this
See Electrical department for prepared components from above assembly
Tools Required
Pipe cutters
Pipe identification markers
Flush cutters
Parts Required
P0000010 6mm 1/8 elbow fitting x 6 P0000046 Fitting: 'Y' Adaptor 6mm x 6
P0000047 Bulkhead Elbow 6mm x 1
P0000159 Fitting: Stem Blanking Plug 6mm x 2
P0000160 Fitting: Flow Controller In Line 6mm x 2
P0000551 6mm inline Quick Exhaust Fitting x 3
P0001030 Fitting: SMC 6mm Equal Tee x 1
P0001008 regulator x 3
P0001009 Regulator nut x 3
P0001106 Plug in reducer 12-8mm x 1
P0001107 Fitting 12mm equal tee x 1
P0001166 12mm tube to tube elbow x 1All bolts to have Loctite 243 adhesive applied unless otherwise stated
All Threaded Pneumatic connections to have Loctite 570 applied
All bolts to be pen marked once adhesive applied and correct tension added
1 Cut 1 off 6mm black pipe at 5 meter and add identification of 2149
2 Use cable 13F1 and 13F from cable loom box
3 Attach pipe and cable as shown
4 Loom additional cable 13F as shown
1 Cut 1 off 6mm black pipe at 5.5 meters and identify as 2159 and fit to turret
2 Use cable 14F1 and fit to turret
3 Fit extension cable 14F to 14F1
1 Cut 2 off 6mm black pipes at 5.5 meters and label as 2241 and 2249
2 Use reed switch cable X215, X215 extension cable
2 Use reed switch cable X215, X215 extension cable
3 Fit X215 reed switch to cylinder. Use test box to set position on switch. Set to home position as shown. (cylinder retracted is home position )
1 Use cable X296 from wiring loom box. Leave right angle end at outfeed side . Run through saddle brace along with X215,14F and 3 off 6mm pipes 2249,2241 and 2159. Cables to exit saddle brace other end
2 Loom and tidy as shown . Exactly replicate loom
1 Bring looms together as shown . Exactly replicate
2 Use spiral wrap to complete loom
3 Use cable tie base to secure loom . Ensure loom length is correct for full range of table movement, and as short as possible
4 Add pre wired cable 40f with interlock as shown ( will require removing from prebuilt top hood if fitted )
5 Integrate into loom from saw motor
Add pre made cables CB17f and CB18F to stepper motor and loom as shown with spiral wrap. Secure with tie wrap to tie wrap base, again ensuring loom length is correct for full travel but as short as possible
Add spiral wrap to switch cable
Quality check that cable and pipe looms do not hinder operation of SY axis table
Movement should be free and no cable pinch or trapping should be possible
check no excessive tension is put on looms or stepper motor connections
en none 0 Draft