Details to install pneumatic and electrical loom

Introduction

This instruction is to incorporate assembly R0015033B Module F Wiring loom alongside this

See Electrical department for prepared components from above assembly


Tools Required


Pipe cutters

Pipe identification markers

Flush cutters


Parts Required

P0000010 6mm 1/8 elbow fitting x 6 P0000046 Fitting: 'Y' Adaptor 6mm x 6

P0000047 Bulkhead Elbow 6mm x 1

P0000159 Fitting: Stem Blanking Plug 6mm x 2

P0000160 Fitting: Flow Controller In Line 6mm x 2

P0000551 6mm inline Quick Exhaust Fitting x 3

P0001030 Fitting: SMC 6mm Equal Tee x 1

P0001008 regulator x 3

P0001009 Regulator nut x 3

P0001106 Plug in reducer 12-8mm x 1

P0001107 Fitting 12mm equal tee x 1

P0001166 12mm tube to tube elbow x 1

Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Y82 Outfeed top clamp Y204 Clamp position

1 Ensure clamp assembly is lifted to the highest position

2 Cut 4 off 6mm black air pipes at 5 meters long

3 Route cables through energy chain and box section

4 Exit pipes here , and use air to blow through and identify as 821.829,2041 and 2049

5 Insert loom through cut table hole then wrapped in large spiral wrap

6 Connect cylinders as shown, ensure cylinder shown is fully extended

Étape 3 - Y80 Infeed Top clamp and Y204 Clamp position

1 Ensure Clamp assembly is lifted to highest position

2 Cut 4 off 6mm black air pipes at 4 meters long

3 Retrieve cable CBX138 from electrical loom box