Fitting and setting details for Sy assembly and centralise top table
Auteur Gareth Green | Dernière modification 2/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Fitting and setting details for Sy assembly and centralise top table
R0015334_Fit_Centralise_Front_Table_Screenshot_2023-10-23_103332.png
Tools Required
Standard hex keyset
1 meter straight edge
Large parallels
150mm engineers square
Engineers level 300mm
Parts Required
H0004543 Gap cover saw finger guard
R0000562 Bench assemble centralise top table
R0015037 Bench assemble SY AssemblyAll bolts to have Loctite 243 adhesive applied unless otherwise stated
All Threaded Pneumatic connections to have Loctite 570 applied
All bolts to be pen marked once adhesive applied and correct tension added
Fit 2 off 1/2" x 1" dowels to frame as shown . Ensure dowels are fully seated . Ensure chamfered end of dowel is inserted first
Secure with 2 off M8 x 12 KCP grubscrews
Attach R0000562 Bench assemble centralise top table as shown
Use 4 off M8 x 20 socket caps
Fit assembly at highest position in slots
Dry fit fasteners, apply medium tension
Add 4 off M8 x 20 KCP grubscrews to points shown .
Adjust grubscrews to touch dowels
Fit 4 off M8 x 12 flat bottomed grubscrews to the points shown
Wind grubscrews to touch frame
Set initial position of assembly using engineers level on the indicated axis
Use M8 squareness adjusting grubscrews to set position
Set both positions level
Fit H0004543 Gap cover saw finger guard to assembly
Use 3 off M5 x 12 socket caps and A form washers
finalise fasteners
Mount R0015037 Bench assemble SY Assembly
Use 8 off M6 x 20 socket caps
Dry fit fasteners
Use engineers square to check squareness of front rollers to infeed and outfeed cut tables
Use adjusting grubscrews to set square accurately
Adjusting grubscrews must be set under tension
Only adjust 1 off grubscrew in each pair. Do not jack top table frame away from main frame . 1 point of contact must always be present
Set height of Sy assembly to cut tables using jacking grubscrews
Release pressure on front 4 off M8 x 20 socket caps
Use M8 x 20 grubscrews to adjust height of assembly
Set to gap of 1.5mm -+ 0.5mm
Ensure assembly sits level/even across all rollers
Apply final tension with adhesive to front M8 x 20 socket caps
Once height has been adjusted, roller squareness must be checked and reset if movement has occurred . Both height and squareness will have to be manipulated together to achieve all settings to requested specification
Attach saddle brace to assembly using 2 off M6 x 16 socket caps 2 off M6 x 20 socket caps all with penny washers
Incorporate turret brackets at rear fixing point when mounting saddle brace
Do not apply tension or adhesive to bolts
Use 2 off straight edges against back roller fence
Add offset shim of 0.002"/0.05mm to driven side
Set front rollers to touch, using M6 socket caps and counter bore clearance to adjust
Report if unable to achieve parallel from this movement
Check once height is adjusted, that Z block operation does not foul cut tables
To do this move both z blocks by hand to active and home position and check contact is not made with the cut tables
Recheck all settings once final adjustment has been made
Roller squareness to cut tables
Roller height to cut tables
Parallel to back fences
Individually remove and apply adhesive to fasteners and apply final tension
Recheck all settings once final adjustment has been made
Roller squareness to cut tables
Roller height to cut tables
Parallel to back fences
Check that no adjustment grubscrews are loose.
Any grubscrews that are not required should still have adhesive applied and lightly tensioned to set in position